Stack temperature
Stack temperature becomes useful for loss comparisons when paired with combustion-air temperature: 400°F flue gas with 80°F intake air and 430°F flue gas with 110°F intake air both give a 320°F net rise. DOE's combustion-efficiency table uses this difference with oxygen concentration. Preserve the two raw temperatures, fuel and firing condition so a weather-related change is not mistaken for degraded boiler heat transfer.
Flue gas temperature; high stack points to a fouled exchanger or excess air, and every 50 degrees F costs about 1 percent efficiency
Subtract combustion-air temperature before comparing visits
DOE Steam Tip Sheet 4 bases its natural-gas combustion-efficiency table on flue-gas temperature minus combustion-air temperature. A 400°F stack with 80°F combustion air has a 320°F rise. A later 430°F stack with 110°F combustion air has the same rise. Treating the raw 30°F increase as a heat-transfer loss would misread those records.
Take combustion-air temperature where the appliance actually draws it. A room thermometer is not representative of a sealed outdoor intake under different conditions. Use the same probe location and firing rate for the next combustion comparison; changing either makes a temperature trend harder to interpret.
| Visit | Stack gas | Combustion air | Net rise |
|---|---|---|---|
| Baseline | 400°F | 80°F | 320°F |
| Warmer intake | 430°F | 110°F | 320°F |
Use the DOE rule on its stated basis
DOE's boiler combustion guidance gives a rule of roughly 1% efficiency improvement for each 40°F reduction in stack-gas temperature. The comparison assumes a useful reduction in flue loss at comparable conditions, not a change caused only by colder combustion air. Use measured oxygen and the temperature rise to support the interpretation.
At 3% oxygen, DOE's natural-gas table gives 82.8% combustion efficiency for a 300°F gas-to-air rise and 80.4% for a 400°F rise. That is a 2.4 percentage-point difference for the stated table conditions, showing why the 40°F rule is a rounded screening relationship. The table assumes complete combustion and no water vapor in combustion air.
A recovery temperature belongs to a particular process
DOE Steam Tip Sheet 3 uses a final stack temperature of 250°F in its natural-gas feedwater-economizer recovery example. That is an industrial heat-recovery calculation with a stated endpoint, not the operating target for a condensing boiler. Read the heat-recovery equipment, fuel and vent arrangement before transferring a stack value to another appliance.
A rising gas-to-air temperature difference at the same load and oxygen level supports investigating lost heat transfer. A higher temperature accompanied by changed oxygen or firing rate calls for comparing those changes first. Preserve the raw temperatures as well as their difference, since a calculated efficiency by itself hides the inputs needed to reproduce the result. Carry the baseline into boiler commissioning.
Distinctions
- Net stack temperature
- The gas-to-combustion-air temperature difference. Write the two measured inputs as well as the calculated rise.
- Boiler supply temperature
- The temperature of heated water or steam on the load side. It is not a flue-gas reading and uses a different measurement location.
Frequently asked questions
Why did stack temperature rise after a new intake was installed?
Compare the combustion-air temperature and firing conditions. A warmer intake raises the raw stack reading without necessarily increasing the gas-to-air rise.
Is analyzer combustion efficiency the same as AFUE?
The DOE table's 82.8% result belongs to 3% oxygen and a 300°F gas-to-air rise. It describes that combustion condition; AFUE is a seasonal appliance rating rather than a single stack-sampling result.
Sources checked
Also defined as
- The temperature of the flue gas, the largest heat loss in most appliances, used to calculate efficiency