Field glossary · measurement
IPLV / NPLV
A chiller quotation needs both the integrated efficiency number and its rating basis: IPLV means integrated part-load value at standard conditions; NPLV means non-standard part-load value at permitted application conditions. The calculation weights COP directly but uses a reciprocal expression for kW/ton. Compare quotations with matching editions, temperatures, flows and rating suffixes. An NPLV result retains prescribed part-load conditions, even when its full-load selection matches the project.
Integrated and non-standard part-load value, the AHRI 550/590 metrics for chiller efficiency across the load range
Calculate IPLV in the units on the submittal
Assign A, B, C and D to the efficiencies at 100%, 75%, 50% and 25% load. AHRI 551/591-2026, January issue, combines COP values as 0.01A + 0.42B + 0.45C + 0.12D; its Appendix D expresses the integration in kW/ton as 1 ÷ (0.01/A + 0.42/B + 0.45/C + 0.12/D). The reciprocal form matters: directly weighting kW/ton values gives a different answer. AHRI January 2026 method and Appendix D.
A comparison spreadsheet ranks lower kW/ton ahead of higher values, while the COP column ranks in the opposite direction. Align the rating basis before sorting either column.
Keep the edition and rating suffix on the selection
AHRI's catalog checked November 5, 2026 lists AHRI 550/590-2026 for I-P ratings and AHRI 551/591-2026-2 for SI ratings. The numerical methods and SI temperatures here come from its separately published January issue, AHRI 551/591-2026. Pair each supplier's selection and supporting calculation with the same complete issue date. AHRI edition catalog.
A rating suffix also fixes test conditions. Trane's Chilled-Water Systems clinic uses 44°F leaving water for its I-P standard example; the January AHRI SI issue uses 7.00°C for IPLV.SI, equivalent to 44.6°F. Converting COP to kW/ton preserves the original test basis. Retain the suffix until the manufacturer supplies a selection at the other conditions. Trane rating conditions.
Which NPLV conditions can actually change?
NPLV.SI permits selected leaving-water temperature and full-load condenser conditions while retaining a prescribed part-load calculation. In AHRI's January 2026 SI issue, water-cooled NPLV.SI uses 19°C entering condenser water at 50% load and below, or the manufacturer's higher minimum. A 32°C full-load selection therefore uses 25.5°C at 75% load and 19°C at the two lower points when the manufacturer's minimum permits. AHRI SI rating method.
The same January issue holds water flows at their full-load values throughout those rating points. A report with variable water flow, or 32°C condenser water at every load, describes a different application profile. Request its individual capacities, input powers and temperatures without relabeling it NPLV.SI.
A quarter-load rating does not prove continuous unloading
AHRI's January 2026 SI issue allows interpolation between bracketing points and applies a cycling-degradation correction below the minimum unloading step. Extrapolation is excluded. Identify directly determined, interpolated and cycling-corrected points separately on the selection; a published quarter-load efficiency alone does not establish continuous operation at that load.
Daikin's WMC engineering catalog connects short cycling to loads below minimum plant capacity and systems with insufficient water volume. Carry those application limits alongside the efficiency metric. Identify which quoted points are directly determined, interpolated or corrected for cycling. Daikin CAT 628-3.
Trane's clinic treats IPLV and NPLV as comparisons between individual chillers, rather than predictions of annual building energy. An energy estimate also needs the plant's load sequence and the power used by pumps and cooling towers. An NPLV at project water temperatures still retains the rating's load weights.
The chiller selection guide introduces the machine families; the phased-load comparison supplies the weighting calculation and annual-energy analysis.
Distinctions
- Application part-load points
- A selection at specified operating conditions is useful even when it does not qualify for an IPLV or NPLV label. Keep its actual temperatures and flow schedule instead of forcing it into the integrated-rating field.
- Minimum stable load
- This is an operating limit of the selected machine. An efficiency rating calculated below that limit can include cycling; it does not extend the continuous operating envelope.
Field example
At the four specified load points, a chiller selection reports 0.60, 0.45, 0.35 and 0.50 kW/ton. Applying the reciprocal method in AHRI's Appendix D gives 1 ÷ (0.01/0.60 + 0.42/0.45 + 0.45/0.35 + 0.12/0.50) = 0.404 kW/ton, rounded. Direct weighting gives 0.4125 kW/ton and fails to reproduce the integrated rating. Keep the four source points beside the spreadsheet result.
Frequently asked questions
Can I convert an IPLV.SI to IPLV.IP just by changing the units?
A unit conversion leaves the original rating conditions intact. IPLV.IP and IPLV.SI use different temperature bases, including the 44°F and 7.00°C leaving-water points discussed above. Obtain the required rating from the manufacturer when the specification names the other suffix.
What should accompany an NPLV number on a quotation?
Request the standard and edition, rating suffix, units, full-load selection conditions, part-load temperature schedule, water flows, fouling allowances and minimum unloading capacity. These fields explain the result and expose unlike selections before equipment is ordered.
Sources checked
- AHRI: current 550/590 and 551/591 edition catalog, checked November 5, 2026
- AHRI 551/591-2026 (SI), January issue: Section 5.4, Table 6 and Appendix D; basis for the numerical methods on this page
- Trane TRG-TRC016-EN: Chilled-Water Systems clinic, standard ratings and comparison basis
- AHRI: liquid chiller performance-rating scope
- Daikin CAT 628-3, June 2022: WMC chiller application guidance on minimum capacity, water volume and cycling
Also defined as
- Integrated and non-standard part-load value, weighted efficiency at 100/75/50/25 percent per AHRI 550/590
- AHRI 550/590 weighted part-load efficiency, at standard (IPLV) or project (NPLV) conditions