Field glossary · process
Erosion corrosion
Erosion corrosion combines corrosion with fluid-driven removal of a protective film or metal. A restriction is one possible cause, not a condition required for the diagnosis: AMPP also identifies abrasive particles and flow geometry as contributors. In copper plumbing, measure flow through the actual bore and preserve the failed surface. At 6 gpm, nominal 3/4-inch Type K carries about 11% higher average velocity than Type L because its thicker wall reduces the bore.
Pipe wall and fitting wear from velocity above the limit, seen as grooves and pinholes at elbows
Preserve the obstruction as well as the leaking elbow
AMPP's corrosion guidance identifies cut-end burrs, abrupt direction changes, misalignment and flow restrictions as features that promote erosion corrosion. Keep enough adjoining tube with the failed fitting to show the inlet condition. Mark the flow direction before removal, photograph the bore and retain deposits before cleaning the sample. A polished repair sample has already lost part of the evidence.
NASA's Kennedy Space Center describes erosion-corroded surfaces as relatively clean compared with many other corrosion forms. A swept patch beside deposits is therefore worth recording separately from the overall amount of scale. Map the thinnest region against the fitting inlet and the next change in direction rather than treating every pinhole in the building as one water-chemistry diagnosis.
Calculate average velocity from the actual bore
Petersen Products' copper dimension chart lists a 0.785-inch inside diameter for nominal 3/4-inch Type L tube and 0.745 inch for Type K. At the same flow, the thicker Type K wall leaves a smaller flow area. Using nominal size in the velocity calculation hides that difference.
From flow divided by circular area, velocity in ft/s is approximately 0.4085 x Q / d squared, with Q in gpm and d in inches. At 6 gpm, those bores produce about 3.98 ft/s in Type L and 4.42 ft/s in Type K. The thicker replacement raises velocity by about 11%. A 1-inch Type L tube, listed at 1.025-inch bore, carries that flow at about 2.33 ft/s.
These are cross-section averages, not the local velocity at a burr or valve throat. At unchanged flow, a passage with half the original area has twice the average velocity through that passage. Photograph the restriction and distinguish its opening from the tube bore in the water-supply sizing record. Use an operating flow measurement, since changing a restriction also changes the system's hydraulic resistance.
A harder replacement does not settle the cause
AMPP cautions that greater material hardness does not necessarily provide greater resistance to erosion corrosion. A material substitution needs the fluid conditions and the geometry that produced the damage, not just a thicker or harder product on the purchase order.
On a hot-water return, record flow with the circulation pump running, the water temperature, pump setting and balancing-valve positions. Repeat the flow measurement after the correction. The piping-material guide covers material selection; the failure record should establish what changed hydraulically. A repaired joint that holds pressure establishes tightness at the repair, while the flow record explains whether the damaging operating condition changed.
Distinctions
- Cavitation damage
- AMPP identifies a pressure drop below the liquid's vapor pressure as the condition that forms cavitation bubbles. Their collapse on pressure recovery damages the surface. A cavitation finding therefore needs pressure and temperature evidence, not just visible air bubbles or a high calculated tube velocity.
- Exterior corrosion
- Wall loss beginning on the outside of the tube calls for an exposure record of the surrounding materials and moisture. A high calculated internal velocity does not establish which surface the attack started on.
Frequently asked questions
Can a normal flow reading rule out erosion corrosion?
A modest tube-average velocity does not eliminate a small, fast-flowing passage at a restriction. A reading taken after opening or replacing a valve also describes a different operating state. Record when the flow was measured and what had already changed, then relate the failed surface to the retained upstream parts.
Will thicker copper stop the pinholes?
At 6 gpm, switching the example from Type L to Type K raises average velocity from 3.98 to 4.42 ft/s. The additional wall does not remove a burr, abrasive solids or adverse water chemistry. Separate the replacement's wall allowance from the hydraulic correction and confirm flow after the repair.
Sources checked
- AMPP, Corrosion Basics: Erosion, workmanship, geometry and material-hardness distinctions
- NASA Kennedy Space Center, Forms of Corrosion: erosion-corrosion appearance and collapsing-bubble example
- Petersen Products, Copper Pipe Size Chart: Type K and Type L inside diameters
- AMPP, Cavitation Erosion: vapor-pressure condition and pressure-gradient controls
Also defined as
- Wear of copper from water moving too fast, worst at fittings and on hot lines