Acceptance volume

Specify acceptance volume as usable incoming-water capacity for the selected pressure band, then check the manufacturer's membrane limit separately. Amtrol's AX-15 has an 8.0-gallon shell but a 2.4-gallon maximum acceptance rating. A calculation requiring 2.71 gallons therefore rejects that model even when its shell is large enough. Catalog maximum acceptance and pressure-dependent working acceptance answer different selection questions.

How much expanded water the tank can absorb between the fill pressure and the maximum operating pressure

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Two limits on usable tank capacity

Read the total-volume and maximum-acceptance columns separately. Amtrol's January 2024 EXTROL ASME brochure lists the AX-15 with 8.0 gallons of tank volume but only 2.4 gallons of maximum acceptance. That second number describes the vessel's water-receiving limit; it is not the acceptance factor for a particular pair of operating pressures.

The manufacturer's full-acceptance bladder models have a different relationship between those two ratings. Their larger membrane travel does not eliminate the compressed-air cushion needed in operation. Even when maximum acceptance equals nominal tank volume, the pressure calculation still determines the working volume.

Pressure band and expansion factor

In Amtrol's sizing table, a tank precharged to 12 psig and allowed to reach 27 psig has an acceptance factor of 0.360. Raising the starting pressure to 20 psig while retaining the 27 psig ceiling reduces that factor to 0.168. Those factors assume the empty tank is charged to the minimum operating pressure.

Amtrol's March 2019 critical-sizing method divides expanded-water volume by the acceptance factor to obtain minimum vessel volume. Use pressures at the tank connection, because elevation changes that pressure independently of a remote boiler gauge. Carry the tank-connection pressure from the hydronic expansion-tank installation into the sizing sheet; a gauge at another elevation supplies a different starting pressure.

An 8-gallon vessel that still falls short

Amtrol's water table gives 0.0271 expansion between 60°F and 180°F. A 100-gallon water circuit therefore produces 2.71 gallons of expansion. With the 12-to-27 psig factor, minimum shell volume is 2.71 / 0.360 = 7.53 gallons.

The 8.0-gallon AX-15 clears that shell-volume requirement, but its 2.4-gallon maximum acceptance is smaller than the required 2.71 gallons. It fails selection by 0.31 gallon. Carry both calculated requirements into the next model comparison. Adding nominal vessel gallons without checking membrane capacity does not resolve this shortfall.

A replacement schedule should show the fluid, temperature endpoints, pressure endpoints, calculated expansion and both catalog capacities. This makes a later change in fill pressure or glycol concentration visible as a sizing change, rather than an unexplained relief-valve complaint.

Distinctions

Tank volume
The total internal vessel space, including the gas cushion.
Acceptance factor
A dimensionless pressure-dependent fraction used to calculate required vessel size.

Frequently asked questions

Does full acceptance mean the whole tank fills during normal operation?

No. Full acceptance describes the bladder's available capacity. The operating pressure band still limits how much water can enter while maintaining the required gas cushion.

Can I use the water expansion table for glycol?

Use fluid properties for the actual glycol type, concentration and temperature range. Amtrol's cited table is specifically for water; changing the fluid changes the expansion calculation.

Sources checked

Also defined as

  • Plumbing: The amount of expanded water the tank can actually take in before pressure rises to the limit, always less than the shell size