Field glossary · property
Point of no pressure change
In pump-on versus pump-off measurements, the point of no pressure change is the effective expansion-tank reference, not the whole suction pipe. With the tank tee at 150 kPa gauge and 5 kPa lost between that tee and the running pump, suction is 145 kPa. Compare readings at unchanged water temperature and primary-loop conditions; otherwise thermal expansion or another circulator can obscure the pressure redistribution being tested.
The tank connection used as the reference for pump-induced pressure redistribution; thermal expansion still changes operating pressure
The tank tee and pump inlet are two locations
Caleffi's Basic Concepts and Detailing describes a slight operating pressure drop between the expansion-tank connection and the circulator inlet because that short pipe still has flow resistance. Pumping away does not make the entire suction-side pipe a point of constant pressure. Measure at the tank branch and at the inlet separately if that segment contains a strainer, valve or long run.
At equal elevation, a tank connection held at 150 kPa gauge, a 5 kPa inlet-path loss and a 60 kPa pump differential produce 145 kPa at suction and 205 kPa at discharge. The pump creates a 60 kPa difference; it does not set either reading independently. Record the tee and both pump-port readings with the expansion-tank connection detail, including their elevations.
Why a secondary circuit has its own reference
Caleffi's Common Hydronic Piping Errors treats the primary-loop connection as the secondary circuit's pressure reference in a primary-secondary arrangement. When primary-loop conditions remain fixed, starting the secondary circulator redistributes pressure around this local reference even though the physical tank is elsewhere. Locate the secondary circulator relative to this connection when analyzing branch pressure.
Caleffi shows that a circulator placed on the secondary return can depress pressure throughout the secondary circuit. A positive boiler-room gauge does not establish positive pressure at a high secondary terminal. The branch's circulator differential, elevation and resistance determine its pressure profile. Carry this branch analysis into the makeup-water guide rather than using fill pressure as the only diagnostic number.
Compare pump states without mixing in thermal expansion
Caleffi's expansion-tank discussion separates the tank's compression during heating from pressure redistribution caused by pump operation. For a pump-state comparison, record tank-connection pressure, pump suction and pump discharge together with fluid temperature. A cold, stopped reading and a hot, running reading combine two effects and cannot establish the circulator's contribution alone.
The pump-on minus pump-off pressure change should approach zero at the effective tank reference under unchanged thermal conditions. A substantial change there calls for tracing the tank connection and the measurement location. A closed isolation valve or obstructed connection removes the assumed pressure reference from the operating loop, so the piping diagram alone does not prove that the tank is participating.
Distinctions
- Neutral pressure point
- In building air systems this can describe where indoor and outdoor pressures balance. It does not identify a hydronic expansion-tank connection.
- Zero gauge pressure
- The hydronic reference can be well above atmospheric pressure. “No pressure change” describes a response to pump operation, not a pressure of zero.
Frequently asked questions
Why do the tank-tee and pump-suction gauges differ while running?
In the equal-elevation example, 5 kPa is lost between the 150 kPa tank tee and the 145 kPa suction tap. Measure that segment directly; a restriction there can lower suction while the tank-tee reading stays steady.
Does the pressure at this point stay fixed as the water heats?
No. Compare the tank-tee reading at the same water temperature before and after pump startup. A hot-versus-cold comparison also includes a change in the tank gas volume.
Sources checked
Also defined as
- The expansion tank connection, whose pressure the pump cannot change; tie it near the pump suction and pump away from it