Field glossary · method
Cathodic protection
Cathodic protection supplies current through the surrounding water, soil, or concrete to suppress corrosion at connected steel. Acceptance depends on measured polarization at the steel; for reinforcing steel, FHWA describes a common 100 mV polarization or depolarization criterion. A rectifier operating check establishes equipment status, while structure-to-electrolyte measurements establish whether the installed circuit protects its intended area.
Making the steel the cathode, by galvanic anode or impressed current, so the corrosion reaction at the bar slows to almost nothing
What proves that cathodic protection is working?
FHWA publication FHWA-HIF-22-004 identifies 100 mV of polarization or depolarization at the most anodic location as a common criterion for cathodic protection of reinforcing steel in concrete. That is a change in potential, not an absolute reading of negative 100 mV. Record the reference electrode, measurement location, interruption timing, and the criterion used so the result remains interpretable.
The immediate voltage change when current stops includes removal of voltage drop through the electrolyte. The subsequent change is the depolarization being tracked. Combining those changes into one number credits the system for electrical resistance that did not protect the steel. A survey record therefore needs the relevant timed readings, not just the most negative number seen on the meter.
UST rectifier checks and protection tests have different records
For federally regulated UST systems, EPA requires a qualified tester to test cathodic protection within six months of installation and at intervals no longer than three years afterward. Put those performance-test dates on the service schedule alongside the operating checks below.
EPA's UST operating guidance requires an impressed-current rectifier inspection at least every 60 days, including voltage and amperage readings compared with the corrosion expert's operating limits. A running rectifier with a broken bond or damaged anode circuit can still leave a portion of the system poorly protected.
EPA requires retention of the two most recent cathodic-protection test results and at least the three most recent rectifier inspection records. Keep the two record series separate: one demonstrates protection performance, while the other demonstrates continued equipment operation.
EPA's release-prevention guidance also calls for a cathodic-protection test within six months after repair to a cathodically protected UST system. Schedule that follow-up when the repair is closed out, rather than letting the next routine test date conceal it.
Read a depolarization result
A concrete protection zone reads -620 mV immediately after interruption and -505 mV after the specified decay interval, using the same electrode. The recorded decay is 115 mV. That exceeds the cited 100 mV criterion at that measurement point; the remaining designated locations still determine whether the entire zone meets its acceptance requirement.
Monitoring criteria should follow the application. A parking-structure protection system needs zone measurements, whereas a water-heater anode is serviced as a consumable inside the tank. Keep the installed-anode inventory separate from the evidence that the connected steel is protected.
Distinctions
- Half-cell potential
- A corrosion-potential survey estimates corrosion probability in unprotected reinforcing steel; an operating protection system deliberately changes that potential.
- Galvanic anode
- A galvanic anode supplies current through its own electrochemical reaction. Cathodic protection describes the protection achieved by the complete circuit.
A corrosion-service territory changes when towers appear or disappear; PorchRocket Asset Search reports visible additions, removals, and alterations with dated views on a chosen monitoring schedule.
Frequently asked questions
Does a normal rectifier reading prove the whole tank is protected?
It proves an operating condition at the rectifier. Structure measurements establish whether protective current reaches the required metal surfaces.
Is the 60-day check required for a water heater anode?
The EPA interval cited here concerns impressed-current systems on regulated underground storage tanks. It is not a water-heater service interval.
Sources checked
Also defined as
- Plumbing: Corrosion protection in which a more reactive metal is consumed to protect the steel