With a traffic coating, the estimator buys waterproofing and a renewable wear layer as one deck system; material quantities and cure time belong to specific layers. Sika's Sikalastic-710 Base builds 23 dry mils from 32 wet mils before the wear coats are counted. ASTM C957/C957M-25 applies to membranes with integral wearing surfaces on decks without hydrostatic pressure, and its scope leaves skid resistance and fire retardance to separate project criteria.

An elastomeric traffic-bearing membrane that waterproofs the deck and provides a wearing surface, keeping new chloride out

Used across 2 Anvilfield field guides, most in Concrete.
Updated

ASTM C957 compliance does not establish slip resistance

ASTM C957/C957M-25 excludes specific skid-resistance and fire-retardance requirements from its scope and covers decks not subject to hydrostatic pressure. An aggregate-textured surface and a C957 compliance statement therefore do not supply a measured slip-resistance result. Name the required surface-performance test and acceptance criterion in the project specification.

ASTM C957/C957M-25 uses a minimum 0.020-inch dry base coat in its test methods, while assigning actual installed thickness and aggregate use to the membrane manufacturer. That laboratory specimen minimum is not a finished-system thickness schedule for every garage or balcony.

Take off 24 gallons before adding the wearing course

Sika's February 2024 Sikalastic-710 Base data sheet lists 50 square feet per gallon at 32 wet mils, producing 23 dry mils under optimal conditions. A 1,200-square-foot field divided by that coverage gives a 24-gallon base-coat allowance. Sika identifies surface roughness, porosity and material and substrate temperatures as factors that increase consumption; add the field allowance and detail quantities separately from the wear coats.

Allocate material to measured zones before opening pails. A total delivered gallon count cannot show whether the waterproofing base was thin while the topcoat was heavy. Record each layer's area and usage with its wet-film readings; the traffic-deck installation guide covers the application sequence.

Aggregate grade and vehicle reopening are separate checks

Sika's Sikalastic-715 Top data sheet specifies 16 to 30 mesh quartz aggregate for vehicle traffic and 20 to 40 mesh for pedestrian traffic, with a minimum Mohs hardness of 6.5. It also distinguishes a light seeded broadcast from broadcasting to refusal. A quantity of unspecified sand does not identify the required wearing course.

Sika requires at least 72 hours of cure before Sikalastic-715 Top is opened to vehicle traffic. Its published intercoat cure is 16 hours at 70°F and 50 percent relative humidity, with tack-free condition governing readiness for the next coat. Record the last coat's completion time and actual cure conditions when releasing a parking level; an intercoat observation does not release the zone to vehicles.

On a phased garage repair, the reopening decision belongs to the coated zone, including its latest completed details. A ramp finished after the parking bays controls access to those bays. Coordinate that sequence with the parking-structure restoration plan.

Identify excluded substrates before scheduling preparation

Sika's Sikalastic-710 Base instructions exclude on-grade concrete, lightweight concrete and asphalt pavement from the stated traffic-system application, along with locations exposed to chained or studded tires. These are system-selection limits, not defects that a more aggressive surface preparation removes.

Record whether the deck is elevated or on grade and identify its construction. Separate substrate acceptance from surface-profile acceptance so a crew does not complete preparation for a coating system that excludes the deck itself.

Distinctions

Roof restoration coating
A roof-coating specification does not establish an integral wearing surface for regular tire traffic. Select the traffic system by its documented deck use and layer schedule.

A garage coating estimator tracks municipal deck renewals in PorchRocket Bid Control, including budget and capital-plan signals that precede the public bid.

Frequently asked questions

Is the ASTM 20-mil base-coat minimum the thickness I should install?

That value belongs to the standard's test methods. Install the named manufacturer's complete build for the selected traffic duty, including its separate base and wear layers.

Can a tack-free deck reopen to cars?

Tack-free condition is part of the intercoat assessment. Vehicle reopening follows the final coat's traffic-cure requirement, which is a different acceptance point.

Sources checked

Also defined as

  • Roofing: An elastomeric waterproofing membrane on a concrete deck with an integral aggregate wearing surface for foot or vehicle traffic

Where this shows up