Field glossary · measurement
Psychrometry / GPP
At 70 GPP, each pound of dry air carries 0.010 pound of water vapor. GPP abbreviates grains per pound and expresses humidity ratio, while psychrometry relates this mass ratio to temperature, pressure, and other moist-air properties. Meters commonly calculate the value from temperature and relative humidity; dew-point data also determine it when absolute air pressure is known.
The science of the air-moisture relationship; GPP is grains of water vapor per pound of dry air
Know which mass is in the denominator
Honeywell’s humidity terminology application sheet defines humidity ratio as water-vapor mass divided by dry-air mass and gives 7,000 grains per pound. A humidity ratio of 0.010 pound of water per pound of dry air therefore equals 70 GPP.
Honeywell distinguishes specific humidity by using the total moist-air mass as its denominator. At that same humidity ratio, specific humidity is 0.010 divided by 1.010, or approximately 0.00990. Calling both values GPP without identifying the denominator silently changes the quantity being reported.
Pressure belongs in the calculation
ASHRAE’s 2025 Fundamentals psychrometrics chapter gives humidity ratio as W = 0.621945 × pw / (p − pw), where pw is water-vapor partial pressure and p is total absolute pressure. Using gauge pressure in that equation produces the wrong result.
ASHRAE’s 2025 Fundamentals chapter also relates humidity ratio to dew point at the same total pressure. A dew-point instrument can therefore supply the vapor-pressure input without a separate relative-humidity reading. For either calculation, use absolute air pressure, not the sea-level-corrected pressure reported by a weather service.
Calculated from ASHRAE’s 2025 saturation-pressure and humidity-ratio equations, air at 75°F and 50 percent relative humidity contains approximately 64.6 GPP at 101.325 kPa absolute pressure. At the same temperature and relative humidity but 83.0 kPa, the calculation gives approximately 79.2 GPP. The higher ratio reflects less dry-air mass for the same vapor partial pressure.
Record the meter’s pressure or elevation setting when comparing instruments. Two displays can agree on temperature and relative humidity yet disagree on GPP because one calculation assumes sea-level pressure.
Read drying progress without confusing heat with removal
Heating air without adding or removing water lowers relative humidity while leaving humidity ratio unchanged. GPP therefore helps distinguish a temperature change from a change in water content. It does not establish that a wall, floor, or hidden cavity has reached its drying target.
Across a dehumidifier, inlet and outlet GPP describe a moisture-ratio difference. Water removal rate additionally needs dry-air mass flow; a large difference at very low airflow is not automatically high production.
The water-damage mitigation guide and structural-drying guide cover job monitoring. Attach air readings to locations, times, and material-moisture readings so the psychrometric trend supports the drying record rather than replacing it.
Frequently asked questions
Can two meters agree on temperature and RH but show different GPP?
Yes. Compare their pressure or elevation assumptions. The 75°F, 50 percent RH calculation above changes from about 64.6 to 79.2 GPP when absolute pressure changes from 101.325 to 83.0 kPa, even though those two displayed inputs stay the same.