Source removal
Source removal leaves contamination in collected waste or discarded material, with a record identifying what was cleaned away or taken out at each surface. NADCA ACR 2025 accepts up to 0.75 mg of net debris per 100 cm² under its Vacuum Test on nonporous HVAC surfaces. Porous components use different verification, and reduced odor alone does not establish that the deposit was removed.
Physically removing the soot and char before any air treatment, because you cannot deodorize over the source
Choose the verification method for the surface
NADCA’s ACR 2025 requires HVAC cleanliness verification immediately after component cleaning and before system operation. Delaying the check until after the fan runs makes it harder to distinguish incomplete cleaning from newly introduced debris.
NADCA ACR 2025 accepts a nonporous surface under its Vacuum Test when collected net debris does not exceed 0.75 mg per 100 cm². The result belongs to the defined sampling method, not an arbitrary wipe sample or a photograph of a clean-looking duct.
NADCA ACR 2025 permits its Surface Comparison Test on porous and nonporous components, while its Vacuum Test evaluates nonporous surfaces. Identify the surface before specifying the test; the same numerical acceptance value cannot simply be transferred to fibrous duct liner.
| NADCA ACR 2025 method | Surface | Result being established |
|---|---|---|
| Visual inspection | Porous or nonporous | Visible cleanliness |
| Surface Comparison Test | Porous or nonporous | No significant visible change after the specified comparison |
| NADCA Vacuum Test | Nonporous | Net debris no greater than 0.75 mg per 100 cm² |
What a particulate result does and does not establish
The Vacuum Test measures recovered particulate mass. A passing result therefore establishes cleanliness under that method, not organism identity, absence of every hazardous substance, or resolution of a concealed moisture source. Keep any separate remediation acceptance criteria with their own sampling records.
Label each photograph with the component, access point, viewing direction, and cleaning stage. Pair those identifiers with the surface and test method in the table. A pass on one nonporous test patch cannot serve as a record for an unvisited branch or a different porous component.
Record removed material and the final disposition of components that were not retained. This closes the gap between a waste ticket, which shows that something left the site, and an inspection record, which identifies the source that was removed.
When removal means replacing the substrate
EPA’s duct-cleaning guidance says wet or moldy duct insulation cannot be effectively cleaned and should be removed and replaced. Spraying or coating that insulation leaves the damaged substrate in place.
The HVAC cleaning guide explains collection and agitation, and the fire-restoration guide applies removal to smoke-contaminated materials. The acceptance record should state whether a source was cleaned away, cut out, or left under a separately specified treatment.
Distinctions
- Encapsulation
- A coating retains or isolates material on a surface. Document it as a separate treatment rather than calling the retained material physically removed.
Sources checked
Also defined as
- HVAC: Dislodging contamination by agitation and capturing it under continuous negative pressure, the NADCA-accepted method