Field glossary · material
Protein residue
Protein residue is a fire-restoration label for deposits from scorched food such as meat, poultry, fish, or beans, rather than a laboratory identification of one chemical. Scope the work by affected surface and recoverable deposit. A cleaner selected to lift soil and an odor counteractant selected to reduce emissions perform different jobs, even when both appear in the same kitchen-fire estimate.
Nearly invisible film from a kitchen fire carrying the worst odor; emulsified off and heavily deodorized
Build a surface map before choosing a treatment
Use the cooking location as the starting point, then record deposits on cabinet faces and interiors, the hood, adjacent finishes, and connected rooms. On each substrate, identify the coating and compare a test-cleaned patch with an untreated patch after drying. A single odor observation does not identify every surface that needs cleaning.
Legend Brands describes Degrease-All as a restorative cleaner that removes smoke and greasy soils from water-cleanable surfaces. Its product page identifies an ammoniated solvent formulation, not an enzyme-only approach. Choose chemistry by the substrate and observed removal result rather than treating the word protein as a product prescription.
Keep absorbent finishes separate from washable hard surfaces in the estimate. A test that restores glazed tile does not establish that the same process restores unfinished cabinet backing. Record material retained, material removed, and the endpoint demonstrated on each test patch.
Keep cleaner and deodorizer quantities separate
Legend Brands describes Double-O as odor counteractants, solvents, and detergents. The ProRestore Double-O User Guide specifies 3 fluid ounces of concentrate in enough water to make 1 gallon for ordinary suppression spraying, increasing to 4 ounces per gallon for exceptionally strong odors. These quantities belong to that odor-control application.
ProRestore’s Double-O instructions call for compatibility testing, especially on clear plastics and painted surfaces, and warn that careless application can drive smoke residue farther into paint. Compare wet and dried patches before expanding treatment across the room. Log the cleaner used to recover soil separately from the deodorizer used afterward.
A multistep odor program does not authorize every applicator
ProRestore’s Double-O User Guide excludes Double-O from both cold and thermal fogging devices. Its program describes a separate thermal-fogging step using other named products. The existence of that later step does not change Double-O’s permitted application method.
ProRestore also identifies Double-O as nongermicidal and prohibits contact with food or utensils. An odor-control result therefore closes neither a disinfection task nor a food-contact cleaning requirement. List those as separate work when the loss includes them.
Close the loss with removal and odor records
Document soil recovered, dried finish condition, and any remaining deposit in the cleaning record. Record the subsequent odor result by room and surface condition in the odor record. This makes a return visit traceable to an untreated source, an unsuccessful cleaning test, or a separate odor-management task.
ANSI/IICRC S700-2025, first edition, covers assessment of fire residues and odors as well as restoration cleaning and odor management. The fire-restoration guide and smoke-odor guide place those tasks in the larger job; the surface map and separate quantities make them measurable in the estimate.
Sources checked
- Legend Brands: Double-O product composition and applications
- ProRestore ODORx Double-O User Guide, Revision A; manufacturer document hosted by Aramsco
- Legend Brands Degrease-All: restorative smoke and grease cleaning applications
- IICRC S700-2025, first edition: published fire and smoke restoration scope
Also defined as
- HVAC: Near-invisible greasy film from a kitchen or grease fire with an intense, lingering odor