Fire and smoke restoration
Fire and smoke restoration assigns affected surfaces, contents and systems a cleaning, replacement or repair decision, then verifies each result. ANSI/IICRC S700-2025 covers restoration cleaning and odor management without comprehensively covering reconstruction. Acceptance depends on the item: NADCA's 0.75 mg per 100 sq cm vacuum-test limit concerns net particulate on sampled nonporous HVAC surfaces. It is neither an airborne exposure limit nor a room-odor criterion, and it cannot establish electrical equipment's fitness for service.
Cleaning and rebuilding a building after a fire, covering the char, the soot, the odor, and the firefighting water
Set a restoration boundary for each room and system
IICRC's S700-2025 scope includes assessing residue presence, impact intensity and boundaries in buildings, building systems and contents. Translate those findings into a room-and-system schedule. Give each item a location, affected substrate, proposed result and the record that will demonstrate completion. An untouched adjoining room is a boundary finding that deserves a record too.
The S700 field guide explains residue removal and odor treatment. The scope schedule adds the acceptance decision: cleaned wall finish, replaced porous item, specialist equipment disposition or reconstruction. IICRC lists reconstruction and certain wildfire, chemical-fire and hazardous industrial-fire situations outside S700-2025's comprehensive coverage. Identify those additional work packages explicitly instead of treating the standard's name as a specification for the entire rebuild.
Give HVAC cleaning a measurable closeout
NADCA announced ACR 2025 with visual inspection, the Surface Comparison Test and the NADCA Vacuum Test as verification methods. Its public commercial checklist accepts visibly clean components without further testing unless another method is specified. When visual findings are inconclusive or disputed, the checklist recommends the Surface Comparison Test for porous surfaces and the NADCA Vacuum Test for nonporous surfaces. A vacuum-test allowance therefore needs a stated surface and reason.
NADCA's commercial checklist sets a maximum net debris mass of 0.75 mg per 100 sq cm for its vacuum test. Results of 0.60, 0.75 and 0.90 mg over that area respectively pass, meet the limit exactly and fail. Compare the laboratory's net debris result with the limit, not the weight of the cassette and filter assembly. These results establish surface-particulate cleanliness at the sampled locations.
NADCA's checklist places verification after cleaning and before system operation; when the vacuum test is used, its laboratory results belong in the completion documentation. Include chain of custody for an outside laboratory. Tie each result to the sampled component in the smoke and odor restoration guide's HVAC work package. A passing return-duct sample does not document an unsampled coil.
Separate electrical disposition from cosmetic cleaning
NEMA announced NEMA CS 70008-2026, Evaluating Fire- and Heat-Damaged Electrical Equipment, in its May 28, 2026 release of updated disaster-damage guidance. NEMA describes that guidance as providing criteria for equipment evaluation, manufacturer involvement and replacement or return to service. Assign that equipment decision to its own documented work package.
List the affected panel, control or other electrical item by equipment identifier, then attach the disposition and the party responsible for it. Cleaning the enclosure finish and accepting the equipment for service are separate deliverables. That distinction keeps a completed soot-cleaning line item from being read as an undocumented electrical acceptance.
Make the room schedule explain unfinished work
Give the room schedule separate columns for item, action, acceptance evidence and remaining work. An office wall can have an accepted cleaning result and still await repainting; a return duct can have a passing particulate result while the associated air handler awaits electrical disposition. Separate those statuses so neither line disappears inside a single room-complete checkbox.
Record odor observations with the inspection date, room temperature and HVAC operating condition. An inspection with the air handler off and one during normal operation describe different conditions. Link returned contents by inventory identifier to their acceptance record so the owner can trace an odor complaint to the room, system or individual item.
Distinctions
- Reconstruction completion
- A completed cleaning package establishes the accepted restoration work. New finishes, replaced assemblies and structural repairs belong to their separately defined construction scope and completion records.
Restoration firms offering soot removal alongside contents cleaning use PorchRocket Bid Control to find public cleaning bids from schools, municipalities and state agencies.
Frequently asked questions
Does passing the NADCA Vacuum Test prove a fire-damaged room is ready for occupancy?
NADCA's checklist says its cleanliness verification does not determine microbial contamination or the presence of hazardous materials. A passing surface-particulate result therefore cannot stand in for those findings, an odor inspection or an occupancy decision. Keep each acceptance result under its own scope and responsible party.
Sources checked
- IICRC, ANSI/IICRC S700-2025, first edition: scope, restoration work plan and exclusions
- NADCA, October 13, 2025 announcement of ACR 2025: scope and cleanliness-verification methods
- NADCA, Commercial Checklist: nonporous-surface vacuum test, 0.75 mg/100 sq cm criterion and completion records
- NEMA, May 28, 2026: release of CS 70008-2026 and updated equipment-damage evaluation guidance
Also defined as
- HVAC: Stabilizing and cleaning a structure after a fire, removing soot and odor and drying the suppression water