ANVILFIELD Try FieldOS

Field glossary · material

Non-condensables

Non-condensables are gases, chiefly air or residual nitrogen, that remain gaseous at the refrigerant circuit's condensing conditions. Their partial pressure adds to refrigerant pressure, so a gauge no longer represents refrigerant saturation pressure alone. Moisture is a separate contaminant with its own purity test. Distinguishing the two matters when interpreting a laboratory report, an elevated condenser approach or a low-pressure chiller's purge history.

Air and moisture in the refrigerant circuit that blanket condenser tubes and raise condensing pressure and lift

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Read the vapor sample and water result separately

EPA's refrigerant-purity specification in 40 CFR Part 82, Subpart F, Appendix A limits air and other non-condensables in R-134a to 1.5% by volume at 25°C. EPA's Appendix A specifies a vapor-phase sample and gas chromatography with a thermal-conductivity detector for the non-condensables determination. This is a packaged-refrigerant purity criterion, rather than a permitted air percentage for an operating condenser.

The same EPA specification limits water in R-134a to 10 ppm by weight and determines water from a liquid-phase sample. A cylinder can pass one test and fail the other:

EPA's reclamation definition references AHRI 700-2016 through the federal specification. AHRI's current Refrigerant Testing Laboratory program lists AHRI 700-2024 as its refrigerant specification. Identify the requested specification on the laboratory order so the report states which edition and acceptance basis it answers.

R-134a contaminant testSample resultAppendix A limitResult
Air and other non-condensables, vapor sample at 25°C1.8% by volume1.5% by volumeFail by 0.3 percentage points
Water, liquid sample3 ppm by weight10 ppm by weightPass

Why pressure can imply a false saturation temperature

A pressure-temperature chart assumes the pressure belongs to the identified refrigerant at equilibrium. With air present, total pressure includes a contribution from that air. Converting the total into a refrigerant saturation temperature overstates the temperature attributable to refrigerant vapor alone.

A displayed condenser approach inherits that pressure error when the control calculates saturation temperature from the pressure transducer. Cleaning water-side tubes can leave the false temperature contribution in place. Compare pressure-derived temperature with the machine's refrigerant temperature measurements and purge history before attributing the remaining approach to fouling; the surge-control guide describes the associated operating instability.

Track air removal rather than every minute of purge operation

Trane's CenTraVac manual CVHH-SVX001J-EN, October 2019, distinguishes the purge's Refrigeration Circuit On state from its Pumping Out state. Trane's EarthWise brochure CAP-SLB005-EN, August 2020, describes pump-out trending for leak detection and 7-day reports. Record air pump-out minutes with the reporting interval and chiller operating state.

A running purge compressor does not mean air is being exhausted for that entire period. Trane's control separates refrigeration operation from the pump-out cycle that removes the accumulated non-condensables. Preserve those two durations as separate trend points.

A seven-day total of 14 pump-out minutes averages 2 minutes per day. That average answers a different question from whether all 14 minutes occurred during one shutdown. Keep the chiller-on and chiller-off portions from the Trane report with the daily totals to locate the operating condition associated with air entry.

Preserve the condition represented by the laboratory sample

Appendix A notes that air concentrates in the refrigerant vapor phase and that introducing air during transfer compromises the sample. Record the cylinder identity, refrigerant designation, sample phase and temperature with the result. A sample taken from a different cylinder cannot resolve the condition of the one supplying the job.

Keep contamination removal distinct from the deep-vacuum dehydration operation. Retain both air and water results on the sample report; each answers a separate contamination question.

Distinctions

Mixed refrigerants
Another refrigerant changes the mixture's composition and pressure-temperature behavior. A high non-condensables result identifies a different contamination category; it does not by itself identify a mixed refrigerant charge.

Frequently asked questions

Does passing the water test establish refrigerant purity?

The R-134a sample above meets the water limit and fails the non-condensables limit. Appendix A tests those contaminants separately, and its full purity specification also covers other impurities. Passing one result does not certify the entire cylinder.

Sources checked

Also defined as

  • Gases such as air that will not condense in the system and raise head pressure until evacuated out

Where this shows up

Related guides

Next step: Map tower service territory

Back to the full field glossary