Van-accessible space

A van-accessible space needs at least 16 feet across one stall and its access aisle, divided according to ADA section 502.2. Under the 2010 ADA Standards, the van's approach, parking position, access aisle, and departure route need 98 inches of overhead clearance. Marked widths generally use stripe centerlines, so a 96-inch dimension between two 4-inch stripes leaves 92 inches of unpainted pavement. The bay must also connect to an accessible pedestrian route.

A wider accessible space (11 ft plus 5 ft aisle, or 8 ft plus 8 ft aisle) with 98 in vertical clearance

Used across 2 Anvilfield field guides, most in Paving.
Updated

Lay out the bay and measure its stripe centerlines

Section 502.1 of the 2010 ADA Standards measures marked parking-space and access-aisle widths from marking centerlines. Its exception allows inclusion of the full defining line where the space or aisle is not adjacent to another space or aisle. Establish which boundary applies before taking the tape reading.

In the 96-inch-wide van-space option, two 4-inch stripes spaced 96 inches center to center leave 92 inches of unpainted pavement between their inner edges. The general centerline measurement is still 96 inches. Keep the line width and measured reference points on the layout record; a clear-gap measurement and a centerline dimension describe different geometry.

The paired minima below follow ADA sections 502.2 and 502.3.1; section 502.3.2 extends the aisle along the full stall length. The accessible parking layout guide connects that bay to the wider site layout.

Van stall minimumAccess aisle minimumCombined width
132 in. (11 ft)60 in. (5 ft)192 in. (16 ft)
96 in. (8 ft)96 in. (8 ft)192 in. (16 ft)

Angled van stalls need passenger-side access aisles

The 2010 ADA Standards, section 502.3.4, require access aisles on the passenger side of angled van parking spaces and prohibit aisles from overlapping the vehicular way. A shared aisle that serves the wrong side of an angled van stall fails this arrangement even when its width is sufficient.

For a new angle or circulation direction, draw the van in its intended parked orientation and identify the passenger side on the plan. ADA section 502.3 requires the aisle to adjoin an accessible route; section 502.7 also protects that route's required width from vehicle overhang. Carry the vehicle orientation and overhang into the stall geometry layout before fixing the striping control lines.

Run the van calculation separately for each facility

Apply ADA section 208.2.4 as van spaces = ceiling(required accessible spaces / 6): a facility requiring 13 accessible spaces needs three van spaces. Keep each facility's input and rounded result on separate worksheet lines, as required by section 208.2. Rounding once after adding facilities can erase required van spaces.

Two ordinary 70-space lots each fall in the federal table's 51-to-75 bracket, requiring three accessible spaces apiece. The worksheet therefore contains two calculations of ceiling(3 / 6), producing one van space in each lot. Combining the lots into one 140-space calculation would instead produce five accessible spaces and one van space, losing the separate-facility requirements.

Check slope across the aisle before accepting the striping

The 1:48 maximum in ADA section 502.4 equals a 1-inch elevation difference over a 48-inch horizontal run. Take readings in the direction of steepest fall as well as along and across the stall; a compliant reading in only one direction misses a twisted surface. Record the measured slope and instrument location so the pavement result can be distinguished from a striping error.

Parking clearance differs from passenger-loading clearance

A canopy giving 100 inches of clear height exceeds the 98-inch van-parking minimum in ADA section 502.5 but falls 14 inches short of the passenger-loading-zone minimum in section 503.5. Label the facility use on the clearance survey before accepting that canopy. The parking requirement covers the access aisle as well as the vehicle space and the routes serving it.

The Access Board's parking guide follows the vehicle route from the parking-facility entrance through the space and back to an exit. Locate overhead doors, signs, equipment, and structural obstructions along that complete path. A compliant stall beneath a high ceiling still needs a route that accommodates the arriving and departing vehicle.

Frequently asked questions

Can a car use a van-accessible space?

The Access Board explains that the federal van-accessible designation identifies the space's features and does not restrict it to vans. Parking privileges and enforcement are governed by the applicable motor-vehicle rules.

Can a front lot's extra van space cover a separate rear lot?

Calculate the requirement for each parking facility. A sitewide total alone does not establish the required distribution. ADA section 208.3.1 includes a separate provision for locations providing substantially equivalent or greater accessibility, measured by distance, parking fee, and convenience.

Does a pavement symbol replace the van-accessible sign?

Where ADA section 216.5 requires identification, section 502.6 calls for a sign bearing the accessibility symbol and van-accessible designation, with its bottom at least 60 inches above the surface. Section 216.5 exempts sites with four or fewer total parking spaces and residential spaces assigned to specific dwellings from identification signage; those exceptions do not remove the applicable space dimensions.