Pavement thermoplastic is a heat-softened marking compound; PPG describes its formulation as 100% solids containing binder, pigment, filler, and glass beads. Specify the contract revision with the material: TxDOT's SP666-002, required from the September 2026 letting, changes Type I non-profile thickness minima to 60, 100, or 125 mils according to the work category and requires a ribbon gun applicator. A quantity based on the original 2024 book's 90-mil category would understate the current 100-mil requirement.

A molten marking material applied around 90 to 125 mils that outlasts paint on high-traffic markings

Used across 3 Anvilfield field guides, most in Paving.
Updated

Specify the resin as well as the application method

PPG's Ennis-Flint thermoplastic bulletin distinguishes wood-derived alkyd resins from petroleum-derived hydrocarbon resins. Its alkyd description includes resistance to oil and diesel fuel, while its hydrocarbon description identifies long-line use. Record the approved formulation rather than treating every bag that melts in the kettle as the same material.

PPG lists spray, ribbon, and screed application for its thermoplastic family, but TxDOT SP666-002 specifically requires a ribbon gun for Type I markings. Confirm that the proposed applicator matches the contract before using a manufacturer's broader application list in a submittal. The marking materials guide compares the surrounding product systems.

Use the September 2026 thickness revision

TxDOT's current special-provision register makes SP666-002 mandatory for Item 666 projects beginning with the September 2026 letting. The June 2026 provision replaces the non-profile thickness schedule and gives Type I all-weather markings the same three categories below. Identify the letting and incorporated provision on the takeoff; the original 2024 book remains the reference for provisions that the amendment leaves unchanged.

These are Type I non-profile and all-weather categories; profile markings have their own section. TxDOT Item 666 still directs completed thickness measurement under Tex-854-B. Match the measurement to the specified stripe type and substrate rather than treating an applicator setting as the acceptance result.

Work category under SP666-002Minimum thicknessChange from the 2024 non-profile schedule
Retracing existing thermoplastic60 mils (0.060 in.)Unchanged
New markings or retracing water-based markings on Item 316 seal coat125 mils (0.125 in.)Previously 100 mils
Other Type I non-profile or all-weather work100 mils (0.100 in.)Previously 90 mils for non-profile work

Turn the revised film thickness into an order quantity

A 100 ft stripe, 6 inches wide, at the revised 125-mil seal-coat minimum occupies about 0.521 cu ft: 100 × 0.5 × 0.125/12. At the former 100-mil minimum it occupied about 0.417 cu ft. The thickness change adds 25% to the geometric volume for that stripe before handling losses.

Convert the 0.521 cu ft to order weight using the selected compound's density and the job's handling allowance. Keep bead quantities separate from compound quantities when the supplier quotes them separately. The paint quantity worksheet uses liquid-paint yields for its own system.

Check bead exposure independently of line thickness

TxDOT's 2024 Item 666 requires beads distributed uniformly across the stripe with 40% to 60% embedment. A full-thickness marking can still fail that criterion when beads are buried too deeply or remain too shallow to stay anchored. Inspect the bead condition along with thickness rather than accepting the visible amount of compound as the entire result.

TxDOT's 2024 Item 666 requires marking material loss to remain at 5% or less in any 1 ft section for at least 30 calendar days after installation. Retroreflectivity has its own measurement and applicable acceptance provisions, so retain the specified optical results separately from thickness and wear observations. The retroreflectivity entry explains the optical quantity.

Distinctions

Thermoplastic in other trades
Roof membranes, wire insulation, and waterstops also use the word thermoplastic. Their product specifications do not establish pavement-marking formulation, thickness, or bead acceptance. Identify the trade and product family in a submittal or search.

Frequently asked questions

Can I order thermoplastic from linear feet alone?

Include line width, specified thickness, surface type, formulation, and application method. Split symbols and crosswalk bars by their marked area. Linear footage becomes a material quantity only after its cross-section is established.

Does the 2026 Texas revision automatically change an older contract?

TxDOT's register applies SP666-002 from the September 2026 letting. For an earlier contract or a private parking lot, identify the specification and amendments actually incorporated in that work. Preserve the distinction between thermoplastic retracing, seal-coat work, and other surfaces when comparing the schedules.

Sources checked

Also defined as

  • A hot-applied marking melted to about 400°F and laid 90 to 125 mils thick for durable lines
  • A solid marking material melted and applied hot, lasting several times longer than paint