ANVILFIELD Try FieldOS

Field glossary · asset

Parking lot

A parking lot is an off-street facility that holds vehicles at ground level on a paved or unpaved surface. Record its surface area by material for maintenance, and its usable spaces by restriction and closure status for operations. Closing a row removes spaces from the available parking supply without reducing the pavement inventory. Entrance throughput is another limit: vacant stalls do not guarantee room for a queue.

An area laid out for vehicle parking, with spaces, aisles and routes to the buildings it serves.

Used across 1 Anvilfield field guides, most in Paving.
Updated

Parking lot area versus pavement treatment area

Separate the parking facility boundary from the surface receiving each treatment. Record asphalt, concrete and permeable surfaces individually, including circulation lanes and entrance aprons in the relevant surface quantity. NIST's 2026 Handbook 44, Appendix C, gives 9 square feet per square yard.

A mapped lot covering 72,000 square feet, with 5,400 square feet of planting islands and 3,600 square feet of concrete pads, contains 63,000 square feet of asphalt, or 7,000 square yards. When repair patches within that footprint also receive the overlay, include them in the overlay area and carry patch preparation as separate work in the paving takeoff.

How to measure parking lot occupancy

Seattle DOT's 2023 Center City Off-Street Parking Study defines percent occupancy as parked vehicles divided by total parking spaces, expressed as a percentage. Its survey also records space restrictions and occupancy by space type. Follow that separation when counting general parking, accessible spaces, charging spaces and permit-only rows; an empty restricted stall does not establish availability for every arriving driver.

Keep the permanent inventory and the temporarily available inventory in separate columns. A general parking section with 160 spaces, 16 closed for work and 136 occupied is 85% occupied against its permanent inventory, but 94.4% occupied against the 144 spaces in service. Label the denominator beside the percentage. Record closed spaces separately so reopening a work zone does not look like newly constructed parking.

Repeat row counts at recorded times, noting closures and unusual events. Carry the space classifications from the approved accessible parking layout into the inventory; a utilization count does not change those designations.

What parking turnover tells the owner

Carrboro's July 2017 Downtown Parking Plan calculates turnover from distinct license plates divided by spaces. Its Rosemary Street lot had 71 plates across 21 spaces, or 3.4 vehicles per space, during hourly observations from 8 a.m. to 6 p.m. on January 14, 2016.

Keep that survey window and interval with the result. A vehicle present at successive counts contributes once to unique-vehicle turnover; return visits by the same plate also remain one unique vehicle. Short visits between observations are missed. Occupancy answers how full the lot is at a moment; turnover answers how many different vehicles were observed using its spaces.

Why the entrance queues while spaces remain empty

FHWA's September 2003 Managing Travel for Planned Special Events handbook uses 9 to 12 seconds per vehicle, or 300 to 400 vehicles per hour per server, for staffed cash transactions at event parking entrances. Convert measured service time to hourly throughput as 3,600 divided by seconds per vehicle. Measure the actual gate process separately from delays inside the lot; this planning range describes manual cash service.

At one vehicle every 12 seconds, a continuously operating lane serves 300 vehicles per hour. Steady arrivals at 400 per hour add 25 vehicles to its queue in 15 minutes. An empty row cannot speed up payment, while a turning vehicle or pedestrian crossing beyond the gate can reduce the lane's effective output.

When to divert arrivals to overflow parking

FHWA's 2003 handbook uses 90% to 95% occupancy as its full-lot rule of thumb, especially for self-park event parking. It also includes vehicles already traveling from the diversion signs toward the entrance in the lot-full decision.

With 200 available event spaces and a selected limit of 190 vehicles, 174 inside plus 16 approaching use the operating allowance. Diverting subsequent arrivals preserves the selected ten-space buffer. Log the available supply, selected limit, count inside, approach count and diversion time to review the loading plan before the next event.

Distinctions

Parking space
One vehicle position. Its rectangle excludes shared circulation pavement, so multiplying stall dimensions by the space count understates the maintained surface.
Parking garage
A structure with parking floors or decks. An overhead footprint of a multilevel garage omits the other levels; take off each maintained floor and ramp separately.
Pavement condition
A record of the surface defects that drive repair scope. A lot with low occupancy can still need extensive pavement repairs; utilization and distress measure different problems.

A larger parking footprint changes the surface inventory; PorchRocket Asset Search monitors visible parking areas for additions and alterations, returning dated views and the owner of record.

Frequently asked questions

Does a low daily average mean the parking lot has spare capacity?

The peak period controls whether arriving drivers find spaces. A quiet morning and a full afternoon can produce a modest average. Compare occupancy at the times each user group arrives, retaining the restricted-space counts.

Can I use entrance counts to estimate occupied spaces?

Gate counts track vehicles inside the boundary. Start from a row count, add entries and subtract exits over matching intervals, then reconcile against occupied stalls. Vehicles still circulating, missed exits and unmonitored entrances create differences.

Sources checked

Where this shows up

Related guides

Next step: Find lot maintenance accounts

Back to the full field glossary