Short load

A short load falls below a ready-mix supplier's threshold for delivery without a minimum-load surcharge, even when the plant accepts that quantity. Superior Ready Mix, for example, accepts 1 cubic yard but applies its short-load charge below 9 cubic yards. Separate the order minimum, fee threshold, truck capacity, and finish-load policy when comparing quotes; each answers a different purchasing or dispatch question.

An order below the plant minimum, which carries a short-load fee

Used across 2 Anvilfield field guides, most in Concrete.
Updated

Separate delivery minimum from fee threshold

Superior Ready Mix and Blalock Ready Mix publish separate delivery minimums and surcharge thresholds in their FAQs. A load can satisfy the delivery minimum and still incur a surcharge. Neither threshold establishes the truck's physical capacity.

Put four fields beside each supplier's quote: requested quantity, accepted delivery minimum, fee threshold, and scheduled load sizes. Add the finish-load terms to the same record. A total order large enough to fill several trucks still needs a decision about its last delivery. The ready-mix ordering guide covers the mix and dispatch instructions.

SupplierSmallest deliverySurcharge thresholdFinish-load treatment
Superior Ready Mix1 cubic yardOrders below 9 cubic yardsFAQ does not publish an exception
Blalock Ready Mix1 to 3 cubic yards, by jobLoads below 6 cubic yardsOne callback per order exempt

A finish-load exception changes the comparison

Blalock's FAQ allows one callback load per order without a minimum-load fee or additional callback charge. It defines that callback as the final partial delivery needed to finish the existing order. A second callback and a new standalone small order fall outside that stated exception.

Rounding a 5-cubic-yard requirement to a 6-yard fee threshold adds 1 cubic yard, a 20 percent increase in ordered concrete. Compare the charge avoided with the added material plus handling and disposal costs. Enter each as a separate line in the concrete estimate, so the estimate shows whether buying the extra yard actually reduces the delivered total.

Short load does not mean short yield

A short-load ticket records how much concrete was ordered. Yield measures the volume produced from the batch. NRMCA's CIP 8, revised in 2016, checks yield using the average fresh-concrete density from representative samples on three separate delivery vehicles; each batch's total material mass is divided by that average density. With mass in pounds and density in lb/ft³, divide the resulting cubic feet by 27 to obtain cubic yards.

A partly filled truck does not establish under-delivery, and the volume remaining in the forms does not by itself establish the truck's yield. Keep the order quantity, delivery tickets, measured form dimensions, and density results as separate records. That preserves the distinction between a dispatched small load, a volume-estimating error, and a measured yield discrepancy.

Distinctions

Callback or finish load
The final partial delivery on an existing order. A supplier's published exception for this load does not describe its policy for an unrelated small pour.
Minimum-load charge
The delivery charge triggered by the supplier's volume rule. It is separate from the minimum quantity the supplier accepts and from any waiting-time charge.

Field example

A crew receives 10 cubic yards against an order and then confirms that 2 more yards will finish the placement. Under Blalock's published one-callback policy, that 2-yard finish load receives the exception from minimum-load and callback charges. A standalone 2-yard pour at another site instead faces the applicable 1-to-3-yard delivery minimum and the below-6-yard fee rule. Link the callback ticket to its original order.

Frequently asked questions

Is a short load an inferior concrete mix?

The term classifies delivery volume and charging. Strength, aggregate, air content, and consistency remain the properties of the ordered mix; the short-load designation does not specify them.

Does every final partial truck carry a short-load fee?

The supplier's finish-load policy decides. Blalock expressly exempts one callback on an order, while Superior's public FAQ states its below-9-yard charge without publishing that exception. Retain the quoted finish-load terms with the order.