Field glossary · measurement
CBR
Read CBR, the California Bearing Ratio, as penetration resistance relative to a crushed-stone reference, multiplied by 100. A corrected stress of 70 psi at 0.10-inch penetration gives CBR 7 against the 1,000-psi reference. That result describes the tested moisture, density and soaking condition; it does not mean 7% compaction or a directly measured pavement modulus.
California Bearing Ratio, a subgrade strength measure relative to crushed stone, correlated loosely to Mr
Calculate CBR at the reported penetration
Oklahoma DOT’s AASHTO T193 laboratory checklist divides corrected stresses at 0.10 and 0.20 inch by 1,000 and 1,500 psi, respectively, then multiplies by 100. Those penetration depths correspond to 2.54 and 5.08 mm. Match the stress to its penetration before dividing; the reference changes between the two points.
At 0.10 inch, 70 / 1,000 x 100 = CBR 7. At 0.20 inch, a corrected stress of 90 psi gives 90 / 1,500 x 100 = CBR 6. Report the test method’s selected result with its load-penetration record, not an average of the two percentages.
Read the conditioning beside the number
ASTM D1883-21 requires soaking before penetration unless the client specifies otherwise or soaking has been shown not to affect the result for the material tested. An unsoaked value should therefore be identified explicitly, rather than silently substituted for a soaked design input.
FHWA’s Geotechnical Aspects of Pavements explains that as-compacted specimens at optimum moisture and density can give substantially higher CBR values than similar specimens after soaking. The comparison is about preparation as well as soil type. File the specified compaction condition and moisture content with the reported strength ratio.
Coarse particles change what enters the mold
ASTM D1883-21 primarily covers laboratory-compacted materials with maximum particle sizes below 19 mm; its modification for coarser material preserves the total gravel fraction while changing the tested gradation. The standard identifies the possibility that modified material can have different strength from the original.
A base aggregate containing oversize particles therefore needs a preparation note. Calling the result a test of the delivered gradation without describing that adjustment overstates what entered the mold. Retain the original gradation and the laboratory’s modified gradation together.
A percentage needs a specimen history
Keep sample location, dry density or relative compaction, molding moisture, soaking history and any gradation adjustment beside the reported CBR. FHWA NHI-05-037 Table 5-28 gives field CBR ranges of 3 to 5 for CH clay and 60 to 80 for GW gravel. Those field ranges provide a screening comparison; they are not substitutes for a laboratory soaked result at the specified density.
FHWA classifies CBR as an indirect strength measure rather than a fundamental material property suitable for direct mechanistic design input. In the pavement design guide, any conversion to resilient modulus needs its own correlation basis. Preserve the measured CBR and label the converted modulus separately so later design revisions can revisit the correlation.
Distinctions
- Percent compaction
- Compaction compares achieved dry density with a selected laboratory maximum. CBR compares penetration resistance with a reference material; equal percentages do not express equal performance.
- Field CBR
- A field test evaluates soil at its field moisture and confinement conditions. A laboratory soaked result addresses a different prepared condition.
Frequently asked questions
Does a CBR value above 100 mean the test is invalid?
No. The reference establishes the denominator rather than a maximum possible strength. A material can resist penetration more strongly than that reference; preparation and test records still need review.
Sources checked
Also defined as
- California Bearing Ratio, a measure of subgrade bearing strength used in pavement design