Field glossary · process
Pumping
Pavement pumping means foundation material is being expelled through a joint, crack or slab edge under traffic movement. FHWA’s geotechnical manual includes wet and dry ejection in that definition. Water seeping at a crack is a related observation, not proof that support material has been lost. Separate the observed discharge, deposited solids and loading response before specifying the repair.
Water and fines expelled from a saturated base under wheel load, hollowing voids under the pavement
Distinguish foundation loss from water bleeding
FHWA NHI-05-037 describes pumping as ejection of foundation material, wet or dry, caused by slab movement under traffic or through cracks in semi-rigid pavement. Look for expelled sand, silt or other support material and movement at the associated opening.
The LTPP Distress Identification Manual groups water bleeding and pumping for condition surveys. That survey grouping includes seepage and water ejection; it does not establish that every wet joint has lost soil. Locate deposits before sweeping and distinguish active discharge under a passing load from an old stain.
Record a moisture-dependent distress consistently
FHWA’s Distress Identification Manual for the Long-Term Pavement Performance Program does not assign severity levels to water bleeding and pumping because the observed amount changes with moisture conditions. That treatment differs from distresses classified by crack width or surface damage.
On a dry inspection, document deposits and their location without implying that active water ejection was observed. Note recent rain, standing water and whether loading coincided with visible discharge. A subsequent wet-weather visit can provide evidence that a photograph of residue cannot.
Count occurrences without duplicating pavement length
The FHWA LTPP manual records both the number of pumping occurrences and affected pavement length, with a minimum recorded length of 1 meter. It measures the affected length longitudinally and limits the combined length to the test-section length.
On a 100-meter section, affected intervals from station 10 to 20 and from 15 to 30 meters cover a combined 20 meters. Adding their individual lengths gives 25 meters and double-counts the overlap. Keep the occurrence count separate from the merged longitudinal coverage so several outlets at the same station do not inflate affected pavement length.
Separate water movement from loss of support material
FHWA’s Geotechnical Aspects of Pavements describes separation layers as preventing fines from pumping or migrating into the base. Drainage capacity and retention of fine particles are therefore different functions to investigate when the surface shows expelled sediment.
Map the deposit back to the pavement opening and underlying layer arrangement. Water appearing at a crack does not by itself identify the source soil or establish the depth of a support void. Compare the observation with drainage records, exposed materials and the investigation described in the subgrade stabilization guide. A repair scope should identify the diagnosed pathway and material loss, not merely the visible stain.
Distinctions
- Asphalt bleeding
- Asphalt bleeding is excess binder visible at the surface. Pavement pumping concerns expelled support material, while water bleeding describes seepage or discharge from below.
- Mechanical pumping
- A building pump intentionally transfers fluid through a system. This pavement term describes an unwanted response of wet support materials to loading.
Frequently asked questions
Does a clean surface after sweeping prove the problem has stopped?
Sweeping removes evidence from the surface. Compare later observations under similar moisture and loading conditions, and retain the original station map so recurrent discharge can be distinguished from newly affected locations.
Sources checked
Also defined as
- Water and fines worked up through the section under traffic, a sign the subgrade is moving