Geogrid

Read a geogrid submittal by the job it performs: permanent tensile reinforcement behind a wall, or aggregate stabilization beneath a pavement. Tensar identifies long-term design strength as a wall-design property and system testing as the basis for stabilization performance. A roll marked 40 kN/m describes force per unit width, not the total force in a strip, a wall height limit, or an automatic reduction in base thickness.

Polymer grid laid between courses and back into the backfill, tying block and soil into one reinforced mass

Used across 3 Anvilfield field guides, most in Landscaping.
Updated

What a kN/m rating means on the roll label

Tensile strength is reported per unit width in the tested direction. A rating of 40 kN/m corresponds to 40 kN across a 1-meter width, or 20 kN across a 0.5-meter width at the same reported strength per unit width. This calculation interprets the units; it does not determine pullout resistance or the wall-to-grid connection capacity.

Tensar distinguishes the long-term strength used for reinforced soil from the aggregate-and-grid performance used for stabilization. Carry that distinction into the submittal: a tensile certificate supports identification and reinforcement calculations, while a proposed pavement thickness reduction needs evidence for the assembled pavement system.

Ultimate strength and long-term design strength

Retaining-wall design uses a strength reduced for creep, construction damage, and durability over the stated life. Solmax's MIRAGRID technical note treats these as separate reductions. Compare the accepted long-term value, reinforcement direction, soil, and temperature with the delivered product; the short-duration breaking load on its own is an incomplete substitution comparison.

Tensar describes conventional geogrid creep testing as sustained loading under controlled temperature for 10,000 hours. The measured response supports longer-term predictions; it is not a claim that the reinforcement will stop deforming when the test ends. Keep creep evidence separate from the short-duration tensile result in the segmental wall documentation.

What installation damage and UV results actually prove

Solmax determines installation damage for MIRAGRID reinforcement by placing and compacting backfill over the grid, retrieving specimens, and measuring retained tensile strength. The backfill and compaction conditions matter because sharp particles and placement loads change the damage exposure. An undamaged roll sample does not measure that reduction.

Solmax specifies at least 70% retained strength after 500 hours of laboratory UV exposure for MIRAGRID geogrids. That is a laboratory resistance criterion, not an allowance to leave reinforcement exposed on a job for 500 hours under any weather.

If matched specimens measure 20 kN/m before UV exposure and 15 kN/m afterward, retention is 15 ÷ 20 × 100 = 75%, above Solmax's cited 70% minimum. That result describes the UV test only. A wall design still needs the separate long-term strength calculation and connection and soil-interaction checks.

Choose the evidence that matches the grid function

For a wall, identify the reinforcement direction, design strength, connection evidence, and soil interaction data referenced by the design. For a pavement, compare the tested grid-and-aggregate system with the proposed materials and loading. A stronger isolated rib does not by itself demonstrate better confinement in a different aggregate.

Preserve the exact product designation on delivery records. Two grids with similar aperture shapes can have different polymers, junctions, and long-term properties. A photograph of the roll pattern cannot establish that a substituted product matches the accepted submittal.

Distinctions

Geotextile
A fabric can separate particles and filter water. An open grid does not supply the same soil-retention function merely because both products are geosynthetics.

Frequently asked questions

Does a grid eliminate the need for a separator?

Soil retention remains a separate design function. A grid that confines aggregate can still need a compatible separator where finer underlying soil would enter the aggregate voids.

Can two products with the same ultimate strength replace each other?

Equal breaking loads leave creep, installation damage, soil interaction, and connection behavior unresolved. Compare the product-specific design properties and the accepted wall or pavement system, including the direction in which each value was measured.

Sources checked

Also defined as

  • Paving: A stiff polymer grid that confines aggregate and bridges soft soil, a mechanical not chemical fix
  • Polymer grid laid into the backfill that ties the soil to the wall, forming a reinforced mass

Where this shows up