Field glossary · method
Daylight
A drain daylights where its buried flow path reaches an exposed gravity outlet. Establish that outlet from surveyed pipe elevations and the receiving stormwater level, not just from lower-looking ground. FHWA’s edgedrain guidance places the outlet at least 6 inches above the ten-year storm flow line. A pipe with continuous downhill grade can still finish below that water surface.
An outlet where the pipe discharges at the surface by gravity at a lower point on grade
Compare the outlet with stormwater, not dry ground
FHWA’s Geotechnical Aspects of Pavements recommends locating an edgedrain outlet at least 150 mm, or 6 inches, above the receiving ditch or structure’s ten-year storm flow line. That highway drainage recommendation compares elevations with a design water surface, not the bottom of an empty ditch.
Record the outlet invert and the receiving water-surface elevation in the same survey datum. A visible pipe mouth can still be submerged during a storm. The subdrain guide covers the collector arrangement; this elevation comparison establishes the outlet boundary condition.
Calculate fall separately from tailwater clearance
For a 100-foot drain beginning at invert elevation 102.40 feet, a 1.0% fall produces an outlet invert of 101.40 feet. A receiving stormwater surface at 101.65 feet submerges that outlet by 0.25 foot, or 3 inches. Positive pipe grade alone has not established a free outlet.
The table applies FHWA’s 6-inch clearance recommendation to the same receiving level. Raising the pipe mouth changes the available fall from the inlet, so reconcile the whole profile rather than adding an upturned outlet to a completed drain. A submerged outlet still passes flow when sufficient head exists, with the downstream water level included in the hydraulic calculation.
| Elevation check | Result |
|---|---|
| 102.40 - (100 x 0.01) | 101.40 ft outlet invert |
| 101.65 - 101.40 | 0.25 ft submergence |
| 101.65 + 0.50 | 102.15 ft outlet invert for 6 in clearance |
Leave an outlet that maintenance crews can find
NYSDOT Highway Design Manual section 9.3.8.2.3 calls for outlet markers because vegetation can conceal edgedrain outlets and prevent maintenance. Its listed blockage sources include rodent nests, mowing clippings and sediment collecting on screens.
FHWA recommends angled or radius outlet connections to facilitate cleaning and video inspection. Set the inspection route and equipment access before fixing the outlet location. Save a locating photograph and measured position that remain useful after vegetation grows; a close-up of the pipe mouth alone gives little help from the roadway.
Distinctions
- Daylighted aggregate base
- A permeable pavement layer can extend directly to a side ditch without a discrete outlet pipe. Its exposed edge and receiving water level still control drainage.
- Utility daylighting
- In excavation work, daylighting can mean exposing a buried utility to establish its location. It does not describe a drainage destination.
Frequently asked questions
Does flowing water during installation prove the outlet is adequate?
It proves flow under the conditions observed. Retain the design tailwater comparison and inspect the completed route for sags, burial and maintenance access before accepting that temporary observation as a permanent drainage result.
Sources checked
Also defined as
- Paving: To discharge the drain to open air at a ditch or slope through an outlet