Catch basin

A catch basin is a surface inlet with sediment storage below its outlet. Its condition is measured in two places: the remaining sump depth and the open flow path through the grate and pipe. Water below the outlet can be normal; water backing above it during a modest storm points to restricted capture, a blocked outlet, or downstream surcharge.

A grated box with a sediment sump and an outlet pipe, set at a low point to take surface water into a pipe

Used across 2 Anvilfield field guides, most in Landscaping.
Updated

Measure the sump from the lowest pipe invert

Tacoma's July 2026 Stormwater Management Manual calls for catch-basin cleaning when deposits reach 60% of sump depth, while preserving at least 6 inches between the deposit surface and the lowest pipe invert. The sump depth is measured from the structure bottom to that invert, not to the grate.

Under Tacoma's two-part criterion, the cleaning trigger is whichever comes first: 60% of the measured sump depth or loss of the 6-inch pipe clearance. The lowest pipe counts whether it carries water into or out of the basin. Use the same bottom reference for the sump measurement and the sediment reading.

Sump depth60% sediment depthDepth leaving 6 inches clearControlling cleanout depth
24 inches14.4 inches18 inches14.4 inches
12 inches7.2 inches6 inches6 inches

Why a full sump sends yesterday's sediment downstream

The Minnesota Stormwater Manual identifies washout as a limitation of standard sump catch basins: high flows resuspend previously captured material. A grate that looks clear from the pavement says little about this stored load. Measure the deposit with a depth reference and compare repeated readings at the same location.

Minnesota also states that flow-through pretreatment structures cannot remove dissolved phosphorus. Their useful role is coarse-particle capture ahead of another treatment practice. A clean basin therefore establishes available sediment storage, rather than proving that the entire drainage system meets its nutrient-removal objective.

Distinguish inlet blockage from downstream surcharge

Leaves matted across the grate restrict entry while water sheets past. A clear grate with water rising from the pipe indicates a different hydraulic condition. Compare the water elevation with the outlet invert and nearby connected structures; the same ponding complaint can originate upstream or downstream of the box.

The subsurface drainage guide covers system layout. For paving work, carry the grate elevation and surrounding drainage plane into hardscape drainage so a sound buried structure is not stranded above the finished low point.

Distinctions

Area drain
A point inlet without a sediment sump has little storage to measure or clean below its outlet.
Hydrodynamic separator
An engineered treatment device has its own flow rating and maintenance criteria. A standard catch basin does not acquire that rating merely by retaining sediment.

Frequently asked questions

Should a catch basin be completely dry?

Standing water below the pipe invert is consistent with a sealed sump. Judge unintended ponding against the outlet elevation and approved detail, rather than drilling an unapproved drainage hole in the bottom.