Field glossary · component
Weep hole
A weep hole connects a concealed collection space to an exterior outlet at the level where water gathers. For brick veneer over concrete masonry, BIA recommends open head joints at least 2 inches high and no more than 24 inches apart. An outlet above its flashing leaves water trapped below it, while an outlet blocked behind the face can look open from outside.
The opening at the flashing line that drains the collected water back out
Open head joints need height as well as spacing
Brick Industry Association Technical Note 28D, June 2018, recommends open head joint weeps at least 2 inches high and no more than 24 inches on center for brick veneer over concrete masonry. Measure the head-joint opening and center-to-center spacing separately, and identify any screen or insert occupying the joint. These are BIA recommendations; record the project's specified outlet detail alongside them.
BIA Technical Note 7, November 2017, identifies open head joints as its preferred weep type and permits noncorrosive screens or vents to discourage insects. An insert must leave a water path through the joint. Use the masonry construction guide to locate the flashing course before recording outlet dimensions.
Wick length and wick spacing are separate numbers
For a detail that uses wicks, BIA Technical Note 7 recommends at least 16 inches of wick length, reaching through the brick into the cavity and along the back of the veneer. The same note recommends no more than 16 inches between wick outlets. Length describes each piece of material; spacing describes the layout across the wall.
BIA Technical Note 7 discourages tube weeps because of their greater clogging risk. Identify the outlet type before applying a spacing number. A drawing calling for open head joints is not satisfied merely by leaving small tubes at those locations.
A high vent does a different job from a low weep
CMHA's TEK 19-04A explains that masonry weeps also act as vents, supporting drying through circulation in cores and cavities. In its discussion of retrofit openings, CMHA locates weeps at the wall bottom and vents at the top or immediately below bond beams. An opening high in a cavity ventilates it but leaves water below its inlet without a gravity outlet.
Inspect three separate conditions: the exterior mouth, the path behind the face, and the inlet elevation above the flashing. Photograph the outlet bottom and the flashing termination in the same view where they are exposed. Report an inaccessible internal path as unverified rather than inferring it from the number of visible openings.
Distinctions
- Retaining-wall outlet
- Discharges from the retained-soil drainage system. Veneer head-joint dimensions describe a different assembly; the hardscape drainage guide follows the wall drain to its outlet.
- Window-frame weep
- Connects the frame's internal collection channels to the exterior. The opening belongs to that manufactured frame, rather than a brick head-joint layout; see the glazing guide.
Field example
Across 24 feet of uninterrupted flashing, a layout with outlets at both ends and 24-inch intervals has 12 spaces and 13 open head joint weeps. A wick layout at 16-inch intervals over that same run has 18 spaces and 19 wicks. Each wick also needs its own specified length; ordering 19 short pieces does not satisfy a 16-inch-long wick detail.
Frequently asked questions
Are 16 inches and 24 inches competing weep-hole spacing rules?
BIA recommends a maximum of 24 inches on center for open head joints and 16 inches for wick outlets. Its separate recommendation for wicks at least 16 inches long describes the material, not the outlet spacing. The head-joint option is BIA's preferred arrangement.
Can I count wall-top vents as the required drainage outlets?
Identify the low outlets independently. Top vents support air circulation; water collected on flashing needs an opening at that collection level to escape by gravity.
Should cotton cord remain in a formed weep hole?
CMHA TEK 19-04A calls for removing cotton sash cord used to form weep openings before the wall enters service. That removable former serves a different purpose from a wick left in a specified wick-weeping detail; identify which system the drawing calls for.
Sources checked
- Brick Industry Association Technical Note 7: Water Penetration Resistance, Design and Detailing, November 2017, pages 7 and 8
- Brick Industry Association Technical Note 28D: Brick Veneer/Concrete Masonry Walls, June 2018, page 12
- CMHA TEK 19-04A: Flashing Strategies for Concrete Masonry Walls, weeps, vents, and maintenance
Also defined as
- Landscaping: An opening through a wall face that lets water behind it escape out the front instead of building up