Field glossary · component
French drain
A French drain collects water from surrounding soil into a permeable drainage envelope and carries it toward an outlet. The envelope can be washed stone or a manufactured aggregate assembly. Selecting the drain means specifying the collector, filter, hydraulic path, and outlet together. A pipe diameter alone does not identify the drainage area the system can dewater.
Perforated pipe in a gravel trench with a soil-compatible geotextile or granular filter, sloped to an outlet, that collects water from the soil
Does a French drain have to contain gravel?
NDS manufactures EZflow French drains with engineered Poly-Rock aggregate in place of gravel. Its listed assemblies include a 3-inch slotted pipe within a 7-inch bundle, a 4-inch pipe within a 10-inch bundle, and a 6-inch pipe within a 15-inch bundle. Those dimensions show why pipe size and overall drainage-envelope size need separate entries on a takeoff.
The NDS EZ-Drain technical specification describes a geotextile-wrapped expanded-polystyrene aggregate assembly, with configurations both with and without a pipe. A pipe-free bundle supplies drainage voids; it does not have the same conveyance function as a piped collector. Match the assembly designation to the drawing instead of treating every wrapped bundle as equivalent.
Calculate fall as an elevation budget
NDS recommends at least 1% slope for positive drainage in its EZflow system. Across 80 feet, that consumes 0.80 foot, or 9.6 inches, of elevation. Add the selected pipe and envelope geometry when setting trench depth; an outlet with only 6 inches of available fall cannot produce that grade over the full run.
The calculation is especially useful when crossing a driveway or connecting to an existing structure. Start with the permitted outlet elevation and work upstream. Changing a surface emitter does not raise the hydraulic capacity of a submerged downstream pipe or recover elevation already lost to a utility crossing.
Find which part of the drainage path has failed
Slow response after prolonged rain differs from a sudden backup during a roof-water surge. Inspect the accessible outlet and collector first, then compare water levels along the contributing wet area. A free-flowing outlet proves that some water can leave; it does not establish that the buried filter envelope still admits water from the soil.
Keep the subsurface drainage layout with the geotextile selection record. Filter compatibility, clogging, and pipe obstruction are different failure modes. Replacing a clear pipe inside a sealed drainage envelope leaves the collection problem in place.
Distinctions
- Interceptor drain
- A French-drain arrangement can intercept lateral groundwater upslope of a protected area. Its position must intersect the water-bearing path.
- Solid conveyance pipe
- Solid pipe transports collected water without deliberately admitting or releasing water along its length. It changes the function of that segment.
Frequently asked questions
Is bundle diameter the pipe diameter?
No. The bundle includes the surrounding drainage aggregate. Order the pipe size, outside bundle size, and piped or pipe-free configuration as distinct product attributes.
Sources checked
Also defined as
- A fabric-wrapped, gravel-filled trench with a perforated pipe, sloped at least about 1 percent to a daylight outlet