Field glossary · measurement
dB
A decibel expresses a logarithmic ratio, with the reference and measured quantity determining its meaning. Optical insertion loss uses a power ratio: loss in dB = 10 log10(input power / output power). A 3 dB loss passes about half the input power; it does not subtract three units from a linear power reading. Keep dB, dBm and acoustic weighting labels separate on the test record.
Decibel, the unit of insertion loss; Tier 1 acceptance includes loss, length and polarity checks
Translate link loss into remaining optical power
NIST SP 811 expresses a power level in decibels as ten times the base-10 logarithm of the power ratio. Reversing the ratio changes the sign. For positive insertion loss, transmitted fraction = 10 raised to (-loss/10).
Using NIST’s logarithmic power relation, the remaining fractions below follow from 10^(-loss/10). They describe transmission, not acceptance limits. A cabling loss budget still needs the permitted loss for the particular application and wavelength.
| Insertion loss | Input power remaining |
|---|---|
| 1 dB | 79.4% |
| 3 dB | 50.1% |
| 6 dB | 25.1% |
| 10 dB | 10.0% |
Subtract dBm readings to obtain dB
Fluke Networks defines 0 dBm as 1 mW of optical power. The m suffix fixes the reference, making dBm a power level rather than an unspecified ratio. Negative dBm is an ordinary reading for power below that reference.
An input of -4 dBm and an output of -7 dBm yield 3 dB of insertion loss: -4 - (-7) = 3. The corresponding powers are about 0.398 mW and 0.200 mW. Adding the readings, or calling their difference 3 dBm, mixes levels and ratios.
Add serial losses, but combine parallel powers first
Fluke Networks states that 10 dB of loss reduces optical power by a factor of ten. Two serial sections losing 2 dB and 4 dB therefore lose 6 dB together, leaving about one quarter of the original power. The logarithms add because the underlying transmission fractions multiply.
Independent parallel power contributions require a different operation: convert each level to linear power, add those powers and convert the total back. Arithmetic averaging of dBm readings gives a geometric mean of power, not the total or arithmetic mean. This power-sum method assumes contributions add without coherent interference; two acoustic sources also need their phase relationship considered.
Distinctions
- Sound-pressure dB
- NIST’s field-amplitude relation uses 20 log10(p/p0); airborne sound-pressure level uses p0 = 20 micropascals. The weighting label is separate from that reference. Optical loss calculations do not supply an acoustic exposure limit.
- Rebar db
- Lowercase db in reinforcement detailing denotes bar diameter. It is a length symbol and has no decibel conversion.
Frequently asked questions
Does 0 dB mean no light?
It means equal compared power levels. Zero optical power has no finite dBm value.
Is a larger dB result always worse?
Interpret the parameter. Larger insertion loss means less transmitted power; larger return loss means a smaller reflected fraction under the positive-return-loss convention.
Sources checked
Also defined as
- Concrete: Nominal bar diameter, the unit many development and lap lengths are expressed in
- Decibel; the unit for loss-style parameters, where more dB of NEXT or return loss is better