Field glossary · measurement
dB/km
dB/km is the distance-normalized fiber loss used to turn a wavelength-specific cable coefficient into dB for a measured length. At the Fiber Optic Association's 1310 nm reference value of 0.4 dB/km, 100 m of single-mode fiber contributes 0.040 dB. Connectors and splices add separate losses. Dividing their combined insertion loss by cable length produces a normalized link result, not the distributed attenuation of the glass.
Fiber attenuation per kilometer, higher at shorter wavelengths
Carry the wavelength with every coefficient
The Fiber Optic Association's outside-plant reference lists generic single-mode attenuation values of 0.4 dB/km at 1310 nm and 0.25 dB/km at 1550 nm. These reference values describe wavelength-specific fiber performance; the installed cable's specified coefficient provides the basis for its fiber-loss calculation.
Convert length before multiplying the coefficient
At 0.4 dB/km, a 100 m segment is 0.100 km and contributes 0.040 dB of fiber attenuation. Multiplying by 100 without converting meters to kilometers overstates that contribution by a factor of 1,000. Keep the length unit in the calculation until the kilometer units cancel.
Do not turn connector loss into a glass coefficient
EXFO describes fiber attenuation in an OTDR trace as a slope derived from Rayleigh backscatter, expressed in dB/km. A connector or splice appears as a discrete event rather than the continuous fiber slope. Their losses belong in the total link budget but should not be attributed to the coefficient of an otherwise uniform fiber segment.
For the 100 m segment above, adding one 0.30 dB connection produces 0.34 dB total loss. Dividing 0.34 dB by 0.100 km gives 3.4 dB/km. That arithmetic is valid as a normalized total-link figure, but labeling it fiber attenuation would assign the connection's loss to the glass. The distinction matters most on short links where connections dominate.
Pick a trace window clear of reflection distortion
FOA's OTDR reference recommends measuring fiber attenuation over a sufficiently long, undistorted trace segment and avoiding nonlinear regions near reflective events. The marker spacing and trace shape belong in the measurement record. A numerical slope calculated inside a reflection recovery region does not characterize the same fiber behavior as a clean segment between events.
Retain the wavelength, launch and receive arrangements, pulse settings, marker positions and raw trace with the coefficient. Compare the wavelength-specific result with the purchased cable specification. Enter that coefficient and length into the loss budget as the distributed fiber contribution, keeping the discrete losses from bidirectional OTDR testing separately identified.
Distinctions
- dB
- dB is the loss contribution entered in the link budget. Multiplying 0.4 dB/km by 0.100 km cancels the distance unit and leaves 0.040 dB to add to the connection and splice losses.
- dBm
- An absolute optical power level referenced to one milliwatt. It is not a distance-normalized loss.
Frequently asked questions
Does 0.4 dB/km mean a 40 percent loss per kilometer?
No. The power transmission ratio is 10 raised to (-0.4/10), approximately 91.2%, corresponding to about 8.8% power loss over one kilometer.
Should I divide the power-meter link loss by cable length?
That produces a normalized result including every connection and splice. Preserve it as such; use a suitable fiber measurement to identify the distributed coefficient.