Field glossary · measurement
Exchange rate
A noise exchange rate specifies how much a sound level must rise to halve its reference exposure time. A dose result also needs the criterion level, criterion duration and counting threshold. OSHA's 5 dB scheme and the NIOSH 3 dB recommendation use different criteria as well as different exchange rates, so report the complete channel setup before comparing their dose percentages.
The dB increase that halves the allowed time: 5 dB for OSHA, 3 dB for NIOSH
Calculate time with both the criterion and exchange rate
For an eight-hour criterion, reference time T = 8 × 2^((Lc - L)/q), where Lc is the criterion level, L is the measured level and q is the exchange rate. Express T and the actual exposure duration in matching units when calculating their ratio. At a fixed criterion, changing q alters the time allowance above or below that criterion.
OSHA 1910.95 Appendix A gives a 2 hour reference duration at 100 dBA using its 90 dBA criterion and 5 dB exchange rate. CCOHS Table 1A gives 1 hour at 100 dBA with an 85 dBA criterion and the same 5 dB exchange rate. That difference isolates a criterion change, without changing the exchange rate.
For NIOSH's recommended calculation, 100 dBA lies five 3 dB exchanges above the 85 dBA criterion, reducing the eight-hour reference duration to 15 minutes. The table compares that result with both 5 dB configurations; it calculates time without assigning the three schemes the same regulatory status.
| Eight-hour criterion setup | Exchange rate | Reference time at 100 dBA |
|---|---|---|
| OSHA 1910.95 Appendix A: 90 dBA | 5 dB | 2 hours |
| CCOHS Table 1A comparison: 85 dBA | 5 dB | 1 hour |
| NIOSH recommendation: 85 dBA | 3 dB | 15 minutes |
Add fractions when the work changes
OSHA Appendix A calculates mixed-level daily dose as 100 times the sum of actual exposure time divided by reference time for each level. Combine all counted tasks in the same channel; moving to another tool does not reset the accumulated fractions.
OSHA Appendix A converts percentage dose to its eight-hour TWA with 16.61 log10(D/100) + 90. That conversion belongs to the OSHA calculation. Applying it to a dose generated using a different criterion or exchange rate gives a mislabeled result.
Threshold and action level have different jobs
The counting threshold excludes levels below the channel's selected floor. It is distinct from the criterion that defines 100% dose. NIOSH's published dosimeter settings specify an 80 dBA threshold, A-weighting, Slow response and a 3 dB exchange rate.
OSHA 1910.95(c) sets the general-industry hearing-conservation action level at 50% dose, equivalent to an eight-hour TWA of 85 dBA in its 90 dBA-criterion scheme. A dose below 100% therefore does not establish that hearing-conservation requirements are absent. Preserve that distinction when interpreting a meter's percentage.
Construction uses 29 CFR 1926.52 and its Table D-2, including combined exposure fractions; the detailed 1910.95(c) general-industry action-level rule belongs to a separate section. Label the applicable rule and save the criterion, exchange rate, threshold and sampling duration with the hearing-conservation record.
Distinctions
- Criterion level
- The steady level corresponding to the full criterion duration. Changing it shifts every reference time even if the exchange rate stays fixed.
- Frequency weighting
- A or C weighting changes frequency response. It does not set how exposure time trades against level.
Field example
One hour at 95 dBA uses 1/4 of the OSHA reference duration; one hour at 100 dBA uses 1/2. Those two tasks contribute 75% dose. With no other counted exposure, Appendix A converts that dose to about 87.9 dBA as an eight-hour TWA, even though the measured tasks lasted only two hours.
Frequently asked questions
Can dose exceed 100 percent?
Yes. It is an accumulated ratio, not a meter capped at 100. A result above 100 percent means the counted exposure exceeded the full reference dose for that channel.
Why does one channel show twice the dose with the same exchange rate?
Compare criterion levels and thresholds before blaming the instrument. At 100 dBA, changing an eight-hour criterion from 90 to 85 dBA while retaining a 5 dB exchange rate halves reference time from two hours to one, doubling that task's dose contribution.
Sources checked
- OSHA 29 CFR 1910.95 Appendix A: reference durations and noise-dose computation
- Canadian Centre for Occupational Health and Safety: criterion levels and exchange-rate tables
- NIOSH Noise-Induced Hearing Loss: 85 dBA REL and 3 dB exchange rate
- NIOSH Understand Noise Exposure, October 2026: dosimeter settings
- OSHA 29 CFR 1926.52: construction exposure table and combined fractions
Also defined as
- Datacenter: How allowed exposure time changes with level; OSHA uses 5 dB, halving the time per 5 dB