Field glossary · measurement
dBA
dBA denotes a sound level measured with A-frequency weighting. It identifies the frequency filter, not the measurement duration, time response or noise-dose rule. A usable reading also states whether it is an equivalent level, a maximum or a time-weighted display, together with the measurement interval and microphone location. Two instruments displaying dBA can therefore report different, valid quantities.
A-weighted decibels, sound level weighted to how the human ear responds to frequency
Which A-weighted quantity did the instrument record?
Preserve the full acoustic metric rather than shortening every reading to dBA. An equivalent level, a retained maximum and a moving display answer different questions even when their frequency weighting matches. Include the measurement interval in the export so another technician can reproduce the comparison.
NTi Audio identifies the Fast response time constant as 125 milliseconds and the Slow response time constant as 1 second. These are display-response characteristics. They do not substitute for the duration over which an integrating instrument calculates an equivalent level or a dosimeter accumulates exposure.
| Metric | Meaning | Field comparison |
|---|---|---|
| LAeq,T | Energy-equivalent A-weighted level over interval T | Same duration and operating cycle |
| LAFmax | Highest Fast-time-weighted A-weighted level in the observation | Same observation period and Fast response |
| LAS | A-weighted level with Slow response | Same equipment state and sampling location |
Construction and general industry use separate OSHA sections
OSHA 29 CFR 1926.52(a) specifies A-weighting and Slow response for construction noise measurements. General industry's 1910.95(a) uses the same weighting and response for its exposure table. A meter configured that way still needs a time history to establish a worker's daily exposure.
For general-industry hearing-conservation monitoring, OSHA 1910.95(d)(2) requires integration of continuous, intermittent and impulsive levels from 80 to 130 dBA. That subsection also requires calibrated exposure-measurement instruments. Identify that monitoring basis in the result rather than presenting its settings as the text of the construction rule.
Save the instrument identity, calibration result, microphone position, equipment state and observation interval. A fixed-position machinery survey and a worker-worn dosimeter sample different receiving positions; compare results according to the question each measurement answers.
Combine independent sources logarithmically
AIHA's sound-pressure-level calculator uses logarithmic addition: combined level = 10 log10(10^(L1/10) + 10^(L2/10)). Ordinary arithmetic addition of the displayed levels overstates the result, while an arithmetic average understates simultaneous exposure. Use levels measured at the same receiving position for comparable equipment operating conditions.
An exposure-monitoring record and an equipment-diagnosis record answer different questions. Retain the complete acoustic metric and repeatable operating condition for the latter, especially when a complaint concerns cycling machinery or a short event hidden by an average.
Distinctions
- dBC
- Uses a different frequency weighting with greater low-frequency contribution. It cannot be converted to dBA by subtracting a fixed number.
- Noise dose
- Combines level with exposure time using a criterion level, exchange rate and threshold. The A-weighting alone specifies none of those settings.
Field example
Two independent steady sources produce 90 dBA and 80 dBA at the same worker position. Their calculated combined level is about 90.4 dBA. Removing only the quieter source lowers the total by about 0.4 dB; the 90 dBA source still controls that position's level.
Frequently asked questions
Is a meter maximum the same as peak sound pressure?
No. A maximum retains the highest value of the selected time-weighted signal. A peak measurement records peak pressure using its specified frequency weighting and detector.
Sources checked
Also defined as
- Datacenter: A-weighted decibel, filtered to approximate human hearing, used by OSHA and most noise ordinances