Field glossary · measurement
NRR
Keep NRR and PAR in separate columns: NRR is the product's laboratory Noise Reduction Rating in decibels, while PAR is the attenuation measured for one worker wearing that protector. NIOSH Publication 2025-104 recommends quantitative individual fit testing instead of its former derating scheme. OSHA's Appendix B still provides NRR-based estimates using the exposure instrument's weighting; neither the package number nor its 7 dB adjustment measures the worker's seal.
Noise Reduction Rating on hearing protection, a lab figure that is derated for real-world use
The 2025 NIOSH change from derating to fit testing
NIOSH Publication 2025-104 recommends individual quantitative hearing-protector fit testing in place of the derating scheme in its 1998 noise criteria. The policy identifies a Personal Attenuation Rating, or PAR, as the objective result for a worker wearing a specific protector. A package NRR cannot establish that individual's fit.
Record the protector model and size, worker, test result and training provided. A new protector or a different insertion technique is a different fit condition worth recording. Carry the worker's achieved attenuation into the hearing-conservation record beside the measured exposure, so selection can be traced to both results.
What OSHA's 7 dB adjustment actually does
OSHA's 29 CFR 1910.95 Appendix B, a general-industry rule, subtracts 7 dB from NRR before subtracting the remainder from an A-weighted TWA in its NRR calculation method. For a C-weighted TWA, that appendix subtracts the NRR directly to estimate the protected A-weighted TWA. Identify the instrument weighting before choosing the calculation.
Using Appendix B's A-weighted method, a 96 dBA TWA and an NRR of 25 produce 96 - (25 - 7) = 78 dBA. That is a package-rating estimate, not an individual's fit result. The appendix's 7 dB weighting adjustment is distinct from any additional program derating, and it is not applied to a PAR. Identify the method beside the result.
Use PAR to choose enough protection
NIOSH's hearing-protection selection guidance targets a protected exposure of 75 to 85 dBA and calculates an individual's protected level by subtracting PAR from measured exposure. Keep that fit-based estimate beside the worker's exposure result. The 2025 NIOSH recommendation does not rewrite OSHA Appendix B's regulatory methods.
At a measured exposure of 96 dBA, a PAR of 12 dB gives a protected estimate of 84 dBA. After fitting instruction, a PAR of 20 dB gives 76 dBA. Both calculations use the individual's attenuation result directly; the NRR-specific 7 dB adjustment is not applied again to PAR. Save the achieved result, not just the rating on the box.
Distinctions
- NRR versus PAR
- NRR accompanies the product. PAR accompanies a worker-protector fit test. Two workers using the same product can have different PAR results without any change to the package NRR.
- Hearing test versus protector fit test
- An audiogram measures hearing thresholds. A protector fit test estimates attenuation from the protector as worn. Passing one does not supply the measurement made by the other.
Frequently asked questions
Can noise-cancelling earbuds replace hearing protection?
NIOSH says active noise cancellation alone should not be treated as hearing protection unless the product is labeled with an NRR. Product attenuation and individual fit still need to suit the exposure.
Does a good fit test cover time spent with the plugs removed?
The PAR describes protection while that protector is worn with the tested fit. Unprotected periods remain part of the exposure record; a fit-test result cannot credit attenuation during those periods.
What should the fit-test record identify?
Identify the worker, protector model and size, fit-test system, PAR and any fitting instruction provided. Follow the selected test system's instructions; NIOSH recognizes that the available systems use different measurement technologies.
Sources checked
- NIOSH Publication 2025-104: Individual Fit-Testing Recommendation for Hearing Protection Devices, January 2025
- OSHA 29 CFR 1910.95 Appendix B: current mandatory NRR estimation methods and weighting adjustment
- NIOSH: Provide Hearing Protection, PAR calculation, 75 to 85 dBA target and active noise cancellation
Also defined as
- Concrete: Noise reduction rating, the labeled attenuation of a hearing protector, derated before use