Field glossary · measurement
Incident energy
A useful incident-energy record reads 'cal/cm2 at a specified distance, compartment and switching state,' followed by the arcing current and clearing time that produced it. It quantifies the arc heat arriving per unit area. When generator operation reduces current enough to delay the upstream trip, that operating case can require more thermal protection than utility operation. Use the controlling report row, including its source arrangement.
Arc-flash thermal exposure in calories per square centimeter, the basis for arc-rated PPE selection
A result belongs to an operating case
Read the source arrangement before comparing results. Utility supply, generator supply and a closed bus tie change the current paths and protective-device response. A bus identifier alone does not distinguish those cases. Put the operating-case name beside the incident-energy result in the equipment register.
IEEE lists IEEE 1584-2018 as its active arc-flash calculation guide. Schneider Electric's explanation of that model identifies three-phase AC systems at 50 or 60 Hz within a 208 V to 15 kV voltage range. A DC battery result therefore needs its own identified calculation method. Send the source-case identifier with the PPE assessment so the clothing selection stays connected to the modeled arrangement.
Read the arcing-current variation result
Schneider Electric's IEEE 1584-2018 calculation workflow includes an arcing-current variation calculation and directs the analyst to retain the worse incident-energy result. A smaller arcing current can move the protective device into a slower operating region. A report that shows only the largest current leaves that comparison unanswered.
Ask the report to identify the arcing current and clearing time associated with the controlling energy result. The useful evidence is the pair: the protective device must be evaluated at the current used for that case. Keep the alternate-source cases and arcing-current variation cases identifiable rather than collapsing them into a single unexplained maximum.
Match the modeled electrode geometry
Schneider Electric identifies five electrode configurations in IEEE 1584-2018. Preserve the actual configuration code in the survey, then collect the physical evidence that distinguishes it from the other four choices. The conductor ends matter as well as their orientation.
For the record, retain the selected configuration with photographs or drawings showing the relevant conductor arrangement. Equipment family alone does not establish every compartment's geometry. An enclosure dimension or electrode selection copied from another lineup becomes a study assumption that the next reviewer needs to see.
| Study code | Physical arrangement | Survey evidence |
|---|---|---|
| VCB | Vertical electrodes in an enclosure | Vertical ends without an insulating end barrier |
| VCBB | Vertical electrodes ending at an insulating barrier in an enclosure | Barrier position at the conductor ends |
| HCB | Horizontal electrodes in an enclosure | Direction the conductor ends face |
| VOA | Vertical electrodes in open air | Absence of an enclosure around the arc location |
| HOA | Horizontal electrodes in open air | Open-air arrangement and horizontal ends |
Identify protection for each compartment
Schneider Electric's application guidelines account for an arc reaching the line side of a main protective device when choosing the clearing device. For a panelboard bus fault that can propagate around the main, the upstream device's clearing time governs the modeled exposure. A row credited to the local main therefore needs evidence that its protection assumption matches the fault location.
Map the report location to the actual compartment and upstream protective device. Carry that mapping into the study and label record. NFPA's current workplace electrical-safety standard is NFPA 70E-2027; it supplies the safety framework, while the calculation report must identify its own method and inputs.
Distinctions
- Available fault current
- A maximum bolted-fault-current case used to judge equipment duty does not automatically identify the highest thermal exposure. The clearing response at the calculated arcing current is part of the energy result.
- Incident energy in cal/cm2
- The numerical unit expresses energy arriving per area. The separate units entry explains conversions and time scaling; this entry addresses the operating and physical assumptions that make a reported value applicable.
Field example
OSHA's Appendix E to 1910.269 works through a 12,470 V overhead line with 8 kA maximum fault current and 10 cycles maximum clearing time. For rubber-glove work at 15 in, it selects the next listed 10 kA row and the 18-cycle limit in the 4 cal/cm2 column, giving an estimate of 4 cal/cm2 or less. That result belongs to the appendix's single-phase, open-air case; it is not a switchboard result that can be transferred by voltage alone.
Frequently asked questions
Can two compartments in one lineup have different incident energy?
Yes. Their conductor arrangement, source paths and clearing devices can differ. Match each result to its compartment rather than assigning one row to the entire enclosure by appearance.
Does a generator always lower incident energy?
The generator case needs its own calculation. Lower fault current can produce slower protective-device operation, so source size alone does not determine the thermal result.
Sources checked
- IEEE: IEEE 1584-2018 active standard and calculation purpose
- Schneider Electric: Electrical Distribution Fundamentals Design Guide, IEEE 1584-2018 workflow and application guidelines
- NFPA 70E: publisher's current edition, 2027
- OSHA 29 CFR 1910.269 Appendix E: published overhead-line example and working-distance assumptions
Also defined as
- Thermal energy a worker would receive at the working distance from an arc, in cal/cm2