ANVILFIELD Try FieldOS

Field glossary · safety

AR vs FR

AR (arc-rated) and FR (flame-resistant) require different receiving evidence: a flame-test report alone leaves electrical arc performance unestablished, while an AR submittal includes a cal/cm2 result tied to the offered construction. Match that result to the delivered style and garment label. ASTM F1506-25 covers the finished clothing's construction and labeling as well as fabric performance, so a fabric swatch report alone does not finish garment acceptance.

Arc-rated is flame-resistant fabric that also carries a tested arc rating; all AR is FR, not all FR is AR

Used across 2 Anvilfield field guides, most in Electrical.
Updated

What evidence belongs with an AR clothing order?

ASTM F1506-25 includes finished-garment labeling among its requirements so users can select clothing by arc rating. Its scope also addresses fabric performance, garment construction and subassemblies. Record the garment style and manufacturer alongside the rating, then retain the supporting specification sheet with the purchase record. This connects the delivered item to the performance claim.

A report for a fabric roll answers a narrower question than documentation for a completed garment. Closures, garment construction and the materials used in subassemblies belong in the clothing specification. Attach this evidence to the arc-flash PPE selection before accepting a garment substitution.

The flame test that comes before the arc test

ASTM F1959/F1959M-24b requires materials entering its arc-rating test to have a char length below 150 mm and an afterflame time below 2 seconds when tested to ASTM D6413/D6413M-22. Those are material eligibility criteria for the arc test, not an arc rating. A report containing only char length and afterflame therefore leaves the arc-performance question unanswered.

Keep the test results in their own units. Char length is a length, afterflame is a duration, and arc rating is energy per area. Converting a short afterflame time into a cal/cm2 claim has no basis. The companion ATPV and EBT entry explains the endpoints used to report the arc test.

Separate fabric treatment from product scope

Oberon's clothing guidance recognizes inherently flame-resistant fabrics and fabrics made flame resistant through treatment, and requires an arc rating for either type when sold for arc protection. Neither manufacturing description supplies the missing performance number. Compare the documented garment properties and care requirements rather than accepting the fiber description as a substitute.

ASTM F1506-25 excludes coated or laminated rainwear and hand protection from its scope. Separate these items from the shirt-and-trouser submittal so a general F1506 statement does not get carried across the whole clothing order. The same specification leaves the end user's hazard assessment outside its scope; purchasing still needs the required performance supplied by that assessment.

Distinctions

Flash-fire performance
Westex explains that an arc rating does not predict flash-fire performance. A garment intended for both hazards needs evidence addressing both exposures; a cal/cm2 number alone answers the electric-arc question.
Fabric specification versus garment specification
Fabric evidence identifies the material tested. Finished-garment documentation ties the supplied construction and labeling to the product being purchased. Retain both when the submittal uses a fabric report to support a garment claim.

Field example

An order calls for at least 8 cal/cm2 and ASTM F1506-25 conformance. Bulwark publishes an ATPV of 8.7 cal/cm2 for its SLG8HN plaid shirt, so that published rating answers the order's numerical question. Receiving still needs the exact garment label and conformance documentation. A separate material report showing 100 mm char length and 1 second afterflame under D6413/D6413M-22 answers only the flame-test question, even though those results are below F1959's entry limits.

Frequently asked questions

What should receiving request when a shirt says FR but has no arc value?

Request the garment style, arc-rating documentation, applicable clothing specification and finished-garment label. Keep the purchase line open until the supplier ties the offered construction to an arc-performance result.

Does treated FR automatically have a lower arc rating?

The treatment description does not determine the rating. Read the tested performance for the specific material and garment offered.

Sources checked

Also defined as

  • Arc-rated has a tested cal/cm2 number; flame-resistant alone does not. Arc-flash PPE must be AR

Where this shows up

Next step: Build manufacturing account lists

Back to the full field glossary