Arc-flash boundary

The arc-flash boundary is the thermal-exposure distance established for a particular electrical operating case, using 1.2 cal/cm² as the boundary criterion. Locate it relative to the potential arc source identified by the assessment, rather than assuming the cabinet face is the reference. The result depends on the source configuration and fault-clearing behavior; a marked floor line carries those assumptions with it.

The distance from the gear where incident energy drops to 1.2 cal/cm2, the onset of a second-degree burn

Used across 2 Anvilfield field guides, most in Electrical.
Updated

What the 1.2 cal/cm² line does and does not measure

OSHA’s Protecting Employees from Electric-Arc Flash Hazards identifies the arc-flash boundary with incident energy of 1.2 cal/cm², equivalent to about 5.02 J/cm². The boundary concerns thermal exposure from an arc. Flying material, pressure, sound, and electrical contact are separate hazards that do not acquire a common safe limit at that line.

OSHA warns that an arc-flash boundary can extend beyond the limited approach boundary used for shock protection. A barricade selected solely from a shock-distance table can therefore leave people inside the thermal boundary. Locate both boundaries from the equipment and task information used in the work plan.

A label belongs to an operating case

Match the boundary to the source actually feeding the gear: utility operation, generator operation, and a changed tie position can represent different study cases. Carry that case identifier into the arc-flash label record, together with the protective-device settings on which it depends. A useful label record lets the crew distinguish an evaluated alternate supply from an unevaluated switching condition.

Also preserve the distinction between boundary distance and working distance. Incident energy printed at a stated working distance describes exposure there; the boundary identifies where the selected thermal threshold is reached. Using the working distance as the barricade radius substitutes one study output for another.

Why breaker condition changes the boundary

OSHA 4472 explains that a protective device clearing more slowly than the assessment assumes can increase the incident energy and invalidate the boundary. A breaker’s maintenance condition therefore belongs with its trip settings in the assessment record. An unchanged equipment voltage does not establish that the old boundary still describes the exposure.

NFPA lists NFPA 70E-2027 as the current work-practice edition on November 5, 2026. Keep that edition separate from the study’s calculation method and operating cases. When equipment or settings change, identify which study results were revised and replace the corresponding field labels together; a new date alone does not identify the changed assumptions.

Distinctions

Arc rating
An arc rating describes protective material or equipment performance. The boundary is a distance derived for an electrical exposure; the same garment rating does not imply the same boundary at every panel.

Frequently asked questions

Is the arc-flash boundary always measured from the cabinet door?

The relevant reference is the potential arc source used in the assessment. Carry the study’s reference geometry into field layout; cabinet depth and door position are not interchangeable with that reference.