Field glossary · measurement
Arc rating (ATPV / EBT)
An arc-rating report ties a cal/cm2 value to a tested construction and a statistical endpoint: arc thermal performance value (ATPV) for transmitted heat reaching the burn-response criterion, or energy breakopen threshold (EBT) for specimen opening. Oberon's reporting rule takes the lower endpoint at a fitted 50 percent probability in the laboratory data. Keep the endpoint and layer description with the number; that test probability does not predict an individual worker's injury risk.
The cal/cm2 protection value of arc-rated clothing, from the arc thermal performance value or energy of breakopen threshold
What the 50 percent threshold means
Oberon defines ATPV as the incident-energy level associated with a 50 percent probability that transmitted heat reaches the criterion for onset of a second-degree burn. Heat sensors and the burn-response model establish that endpoint. It describes performance of specimens exposed under the test conditions.
Oberon defines EBT as the incident-energy level associated with a 50 percent probability of holes or tears forming in the layer nearest the skin. Breakopen is a different observed endpoint from heat transmission through intact fabric. The manufacturer reports the lower of ATPV and EBT as the arc rating.
The percentage describes a fitted test threshold. It does not mean that half of a garment's area is damaged, that a wearer receives half the incident energy, or that a material blocks heat completely below the reported number. Preserve the endpoint designation when transcribing a report so its meaning survives the handoff.
How ASTM F1959 exposes the specimens
ASTM F1959/F1959M-24b uses flat specimens held vertically and stationary during controlled electric-arc exposures. Its public scope describes an open-air arc producing heat flux of approximately 50 cal/cm2 per second. That flux is the rate of incoming energy during the test, rather than the final rating printed on the garment.
The method covers a material or combination of materials. A report should identify what was tested closely enough to match the offered product: material construction, layer order and the resulting rating. Clothing procurement connects that evidence to the finished garment through AR versus FR documentation.
Comparing two reports with different failure endpoints
Preserve the laboratory report's endpoint in the purchase schedule so a substitute can be checked against the same test record and construction. An ATPV label does not establish that a fabric is more suitable than an EBT fabric with a higher rating. The actual construction, coverage and required exposure value remain part of the selection.
A fabric test also leaves the site calculation unchanged. The arc-flash study supplies the exposure value to compare with the clothing system. Keep the study's energy and the laboratory rating in separate fields even though both use cal/cm2.
Distinctions
- ATPV versus EBT
- Keep ATPV or EBT as a separate text field beside the numeric arc rating. A spreadsheet sorted only by calories loses which statistical endpoint controlled the material result, information needed when comparing laboratory reports.
- Electrical insulation rating
- ASTM F1959/F1959M-24b expressly excludes electrical contact and shock hazards. Its arc test does not establish voltage-withstand capability.
Field example
Bulwark publishes 8.7 cal/cm2 ATPV for its SLG8HN plaid shirt. Enter '8.7' and 'ATPV' in separate register fields with that style number. Rounding the value up to 9 cal/cm2 would overstate the published rating by 0.3 cal/cm2, about 3.4 percent. Preserve the manufacturer's stated precision when matching a product to an order's minimum rating.
Frequently asked questions
Can a fabric with an ATPV transmit heat before it breaks open?
Yes. The ATPV endpoint concerns heat transfer. The material can remain physically intact while enough heat reaches the sensors to meet the burn-response criterion.
Can the same fabric have different ratings in different systems?
Retain a report identifier for each layer combination. Matching fiber names or catalog families does not identify the specimen stack on which a particular report was based; match the layer order and construction to that report.