ASME A112: plumbing product standards, current names, and submittal checks

A112 identifies a family of plumbing-product standards, each with its own scope and edition. The complete number matters: supply fittings, floor drains, trench drains, supports, and grease-handling devices use different publications. Several standards are jointly issued with CSA Group. A submittal saying only ASME A112 leaves the product's claimed performance basis unidentified, and older drawings can retain designations that have since been split or superseded.

Current edition: Series with separate editions: A112.18.1/CSA B125.1-2024; A112.6.3/CSA B79.3-2022; A112.6.8/CSA B79.8-2022
Updated

Official publisher page

Applies to

Manufacturers use the applicable publication for product design and conformity assessment. Specifiers, purchasing teams, installers, and inspectors need the complete designation and a model-specific record of compliance. The installation's drainage layout, accessibility, support conditions, and required capacity remain separate review questions.

The plumbing fixture guide covers selection by use and water consumption. This reference helps identify which product standard a supplier must actually document, especially where a specification carries an older name.

Key topics

Floor drains and trench drains now have separate publications

ASME A112.6.3/CSA B79.3-2022 covers floor drains, while ASME A112.6.8/CSA B79.8-2022 covers trench drains, utility channels, and grate systems. ASME's trench-drain publication supersedes the trench testing and certification provisions of A112.6.3-2019. A current channel-drain submittal should identify that change rather than copying Floor and Trench Drains from the older title. Retain the selected grate and channel configuration together in the product review.

Small shower drains have overlapping product coverage

ASME A112.6.3/CSA B79.3-2022 includes drains with NPS 2 and smaller outlets intended only for shower areas and identifies overlapping coverage under A112.18.2/CSA B125.2. NPS describes the nominal outlet size here, not the grate width or a verified drainage rate. A two-inch shower outlet therefore needs its intended-use designation and product evidence, not a certification choice based only on the visible grate dimensions.

Supply fitting coverage begins at the supply stop

ASME A112.18.1/CSA B125.1-2024 covers supply fittings and accessories from the supply stop through the terminal fitting. ASME's scope excludes pipes, tubes, and their fittings apart from push-fit fittings. Thus a faucet's product-compliance claim does not establish the upstream distribution pipe's material or joint requirements. Match the submittal to the item being reviewed instead of using one A112 statement for the complete branch assembly.

A legacy pool-cover number needs its successor rule

The federal pool-drain-cover rule in 16 CFR 1450.3 incorporates ANSI/APSP/ICC-16 2017 with listed exclusions. CPSC identifies that publication as the successor to the older A112.19.8 drain-cover reference. An old A112 number on a pool drawing therefore needs reconciliation with the current federal product rule. Keep the cover's applicable certification and specific assembly documentation with the pool equipment submittal rather than treating the historical number as a complete approval. CPSC requires the manufacturer or importer to issue a General Certificate of Conformity for a pool or spa drain cover. Request that model-specific certificate along with the assembly documentation.

Different products on one fixture schedule need different evidence

A carrier, ceramic fixture, supply fitting, and flushing device are separate products even when purchased for the same restroom. Assign the applicable standard to each schedule row and trace its model identifier to the supplied compliance evidence. Grease interceptors likewise need their own product designation and rating record. An undifferentiated A112-compliant cover sheet conceals which items have actually been documented.

How it is used in the field

On a drain package, reconcile the body, outlet, channel, grate, and accessories to the submitted model combination. The ASME trench-drain scope specifically discusses concentrated loading such as hard-wheeled forklifts; identify that service on the purchase schedule instead of accepting a vague heavy-duty description.

Where the contract names A112.6.3-2019 and the supplier submits a channel under A112.6.8/CSA B79.8-2022, present the scope and edition change as a documented substitution. Obtain the specified acceptance of that substitution before treating the newer number as an automatic contract revision.

During receiving, compare product identifiers on cartons and delivered components with the accepted schedule. A compliant item from the same manufacturer can still be the wrong outlet, finish, support arrangement, or assembly. Record that mismatch against the product row so the replacement request identifies the actual item.

Edition history

There is no single A112 edition year. The 2022 harmonized drain publications separate floor drains from trench drains; the supply-fitting publication is the 2024 joint ASME/CSA edition. A reaffirmation retains an older base edition and adds a reaffirmation year, so preserve both when the cited product record includes them.

Adoption

The federal UFGS 22 00 00 plumbing specification, with references aligned to October 2025, lists separate A112 publications, including the 2024 supply-fitting standard and 2022 floor-drain standard. A project must select and incorporate its applicable requirements. Pool drain covers also have the distinct federal requirement in 16 CFR 1450.3, including the exclusions stated there.

Public fixture-replacement bids pair technical submittals with administrative forms, which PorchRocket Bid Control fills from the contractor's own file.

Frequently asked questions

Is ASME A112 enough information on a product submittal?

No. Supply the complete standard designation and edition, the product model, and the corresponding compliance evidence. A112 alone identifies a family rather than a test or product category.

Which standard replaced the old trench-drain reference?

ASME A112.6.8/CSA B79.8-2022 supersedes the trench-drain testing and certification requirements previously contained in A112.6.3-2019. The separate 2022 A112.6.3/CSA B79.3 publication covers floor drains.