ASTM C138/C138M-24a turns a weighed concrete sample into density, then combines that density with batch masses to calculate yield, cement content and gravimetric air. A net 36.25 pounds in a 0.2500-ft³ measure gives 145.0 lb/ft³; a 39,150-pound batch at that density yields 10.00 cubic yards. This mass-volume balance can resolve a delivery dispute, but density alone cannot separate a water change from an air or aggregate change.
Applies to
Producer quality-control staff, field technicians and receiving inspectors use C138 to connect batch records with fresh-concrete measurements. Estimators and owners use the resulting yield evidence when reconciling deliveries. The slump guide places density within the fresh-test set; this page supplies the calculation and reconciliation details behind that companion test.
Key topics
Calculate density from net concrete mass
Subtract the empty measure's mass from its filled mass, then divide by the measure's established volume. FDOT's C138 procedure checklist calls for a level struck surface, a clean exterior and density reported to the nearest 0.1 lb/ft³ or 1 kg/m³. Concrete stuck outside the bowl adds mass without adding measured volume. A heaped surface creates the same kind of error. Both bias the density upward and calculated yield downward.
Three truck samples establish the delivery-yield comparison
NRMCA CIP 8 describes ASTM C94 yield determination using the average density from representative samples taken from three different delivery vehicles. Divide actual batch weight by that density, with the cubic-foot-to-cubic-yard conversion when using pounds and lb/ft³. Reweighing one bowl three times does not provide three independent truck samples. Retain the actual batch quantities with the density results so the calculation can be reconstructed.
Gravimetric air needs an air-free reference density
The Precast/Prestressed Concrete Institute's February 2025 Plant Quality Talk calculates gravimetric air as 100 times the difference between theoretical air-free density and measured fresh density, divided by theoretical density. Use the actual constituent masses and absolute volumes to establish that air-free reference. Selecting 150 lb/ft³ merely because it is a familiar normalweight value changes the calculated air content without measuring anything about the load. This calculation also supplies no hardened air-void spacing result.
How it is used in the field
A measure with an established volume of 0.2500 ft³ weighs 8.00 pounds empty and 44.25 pounds filled. Net concrete mass is 36.25 pounds, giving 145.0 lb/ft³. Three truck results of 144.0, 145.0 and 146.0 lb/ft³ average 145.0 lb/ft³. For a batch weighing 39,150 pounds, the NRMCA calculation gives 39,150 / (145.0 × 27) = 10.00 cubic yards. Compare that result with the ticketed quantity before attributing a form-volume shortage to batching.
Using PCI's gravimetric equation, a theoretical air-free density of 154.0 lb/ft³ and measured density of 145.0 lb/ft³ give 5.84% air: 100 × (154.0 - 145.0) / 154.0. Preserve the theoretical-density calculation beside the result. Otherwise a later change to aggregate relative density or moisture accounting can silently alter the reported air percentage without changing the field measurement.
The cement-content calculation exposes another consequence of yield. A 6,000-pound cement charge divided by 10.00 cubic yards gives 600 lb/yd³. The same charge divided by an actual yield of 9.80 cubic yards gives 612.2 lb/yd³, an increase of about 2.04% with no change in cement mass. C138 includes this content calculation; use it when reconciling a mixture report that quotes cement per delivered cubic yard.
NRMCA TIP 8 describes practical yield variation under ideal conditions of approximately ±1% for non-air-entrained concrete and ±2% for air-entrained concrete, reaching about ±3% at higher air contents. Its discussion says industry standards publish no yield tolerance. A 2% discrepancy therefore needs a batch and placement reconciliation rather than an automatic claim that C138 authorizes or prohibits it. Keep these production benchmarks separate from the contract's acceptance criterion.
Keep the yield calculation beside the actual batch ticket and the placed-volume survey. The ready-mix delivery guide covers ordering allowances; the mixture-proportioning guide covers ingredient quantities. Form deflection, over-excavation and spillage change the volume needed in the work without proving a batching shortage. Reconcile those observations separately before assigning the discrepancy to the supplier.
Frequently asked questions
Can the pressure-meter bowl be used for density?
Yes. NRMCA CIP 41 describes weighing the filled pressure-meter base before measuring air content. Use the bowl's established volume, tare and correctly filled mass for the density calculation. A nominal bowl size entered from memory does not establish its measured volume.
Does a lighter load prove that someone added water?
Density responds to several changes, including air content and aggregate or water quantities. Reconcile the measured result with actual batch masses and the approved proportions before assigning a cause.
Sources checked
- ASTM C138/C138M-24a: active edition and calculation scope
- FDOT C138 procedure checklist, October 2016: measure preparation and reporting precision
- NRMCA CIP 8: Discrepancies in Yield, three-truck density basis and yield equation
- NRMCA TIP 8: Concrete Yield, practical production variability
- NRMCA CIP 41: density measurement using the pressure-meter base
- Precast/Prestressed Concrete Institute Plant Quality Talk, Series 4, Issue 5, February 2025: density, yield and gravimetric air