International Society of Arboriculture
ANSI Z133: the 2026 safety revision and electrical qualification records
ANSI Z133-2026 sets safety and health requirements for arboricultural operations and replaces the 2017 edition. ISA released the edition on May 27, 2026, and announced it on June 12. Its revised electrical framework uses four qualification levels, replacing the former incidental line-clearance category. Employers need training and work-authorization records that identify the current level and exposure, alongside the site's required controls. An arborist credential or an A300 work specification does not establish electrical qualification.
Applies to
Tree care employers, supervisors, climbers, ground workers, trainers, and purchasing agencies use Z133 to establish the safety basis for arboricultural operations. ISA is the publisher and secretariat; ANSI approval identifies the consensus standard.
ISA's current product listing also covers vehicle operations, tools, climbing, vegetation management, and palm work. For an electrical assignment, connect the tree removal work order to the employer's qualification register and the actual conductors and communications equipment at the site.
Key topics
Four electrical levels replace the older three-category framework
TCIA's Z133 committee-member explanation describes four levels: Level 1 is electrically unqualified; Level 2 covers voltages through 750 volts; Level 3 covers voltages through 35 kV; and Level 4 is qualified line clearance at all voltages. It also identifies a condition missing from a simple voltage list: Level 3 work within 10 feet of supply lines above 35 kV requires an abatement plan coordinated with the utility. Document that plan and the worker's actual competency rather than assigning work from the level number alone.
Electrical qualification and utility line-clearance status answer different questions
OSHA 29 CFR 1910.269(a)(1)(i)(E) covers line-clearance tree trimming undertaken to clear electric supply lines or equipment for an organization that operates the system or controls its operating procedures. Apply the work-location definition in 1910.269(x) as well; ownership alone does not establish coverage. Establish who directs the electrical system and who commissioned the work, then identify the applicable worker classification and rules. The OSHA regulation separates electrical-system qualified employees from line-clearance tree trimmers with narrower training.
The revision also brings radiofrequency exposure into training
TCIA's 2026 review identifies radiofrequency-awareness training as a new Z133 requirement, reflecting communications equipment near tree work. Record antenna and communications exposures separately from electric supply conductors. A crew's electrical qualification record does not describe transmitter operating conditions or the RF controls arranged with a site operator. Include those site-specific responsibilities in the job briefing for work near communications installations.
How it is used in the field
Review the employer's qualification register before allocating crews. Each worker's record should identify the training basis, demonstrated competency, assigned electrical level, and the employer's authorization. Match that register to the tasks and exposures on the work order instead of accepting qualified arborist as a complete assignment description.
A site has a 480-volt service and a 13.2-kV distribution circuit. The first voltage is within the Level 2 voltage scope described by TCIA; the second exceeds its 750-volt boundary and falls within the Level 3 voltage range. Record both exposures and assign the work through the applicable qualification, utility coordination, and approach-control requirements. The lower-voltage service does not characterize the entire site.
When a subcontractor's paperwork still says incidental line clearance, obtain the current training and authorization record that explains the personnel's 2026 scope. Updating the label on a bid form alone does not establish the underlying training. Preserve the accepted qualification evidence with the subcontractor and assigned crew records.
For support-system installation, connect the cabling and bracing work order to the access plan and crew qualifications. The A300 prescription identifies what is installed in the tree; the Z133 work planning identifies how the assigned crew is protected while installing it.
At mobilization, reconcile actual site conditions with the planned exposures. A different crew, newly identified conductor, or communications installation should be resolved in the assignment and briefing record before that affected work proceeds. Capture the responsible supervisor and the resulting work limits.
Edition history
ISA announced the 2026 edition on June 12, 2026, with availability beginning May 27. Its official store identifies the edition as the replacement for 2017 and offers English and Spanish versions. Record both the edition and the training materials used when updating the employer's program.
Adoption
OSHA regulations and the consensus standard have distinct roles. Identify the applicable federal or state-plan requirements for the operation, then establish the employer's Z133 training and work practices. A contract requirement for Z133 does not change OSHA's definition of line-clearance work or the employer's duty to assign qualified personnel.
Frequently asked questions
Who publishes ANSI Z133?
The International Society of Arboriculture publishes Z133 and serves as secretariat. TCIA publishes tree care guidance and develops A300, the separate standard for tree care practices and work specifications.
Is incidental line clearance still a 2026 qualification category?
TCIA's explanation says the category was removed. The 2026 framework uses four electrical qualification levels. Identify the worker's actual training, competency, and employer authorization within that framework.
Does an ISA arborist credential establish a Z133 electrical level?
A general arborist credential does not identify the worker's voltage-specific electrical training or work authorization. Those records must establish the qualification relevant to the assigned exposure.
Sources checked
- ISA: Z133-2026 release, availability date, and intended users
- ISA Z133 committee: current edition, official store access, and interpretations
- TCIA, August 12, 2026: electrical levels, line-clearance classification, and RF training
- ISA official Z133-2026 store: subjects, formats, and replacement of 2017
- OSHA 29 CFR 1910.269: scope, worker categories, and training requirements
- U.S. Government Publishing Office: 29 CFR 1910.269, 2025 codification