IEEE Standards Association
IEEE 242: Buff Book status and protection-study reference map
A specification citing the Buff Book invokes IEEE 242-2001, which IEEE placed in inactive-reserved status in 2021. New work benefits from a subject-specific reference map: IEEE 3002.3-2018 addresses fault-duty analysis, IEEE 3004.5-2025 covers low-voltage breaker application, and IEEE 3004.11-2019 covers bus and switchgear protection. Those separate deliverables need coordinated CT inputs, approved relay settings, and identified trip destinations so engineering results can be verified on the installed system.
Applies to
Protection engineers and facility electrical teams use the Buff Book as background when designing a protection scheme or modifying an existing one. Testing contractors use the resulting approved settings, drawings, and functional requirements to establish what the installed devices must demonstrate.
Use the relay coordination guide to organize the settings review, then attach the CT ratio and trip-matrix records described below. Those records connect a study's primary-current result to what a test set injects and what the installed protection operates.
Key topics
The breaker chapter has a traceable 2025 reference
IEEE states that IEEE 3004.5-2025 encompasses the material in Chapter 7 of IEEE 242-2001, alongside material from the Blue Book. The active 2025 practice addresses low-voltage circuit-breaker selection, ratings, trip functions, accessories, and applications. This is a specific subject migration, not evidence that one breaker document replaces the entire Buff Book or every part of an older coordination study.
Bus and switchgear protection need a defined protection zone
IEEE 3004.11-2019 covers bus and switchgear protection, including fault protection and isolation strategies for substation equipment. Use that subject boundary to define the bus-protection package: the zone, its current inputs, disconnecting devices, trip destinations, and isolation result. A feeder time-current plot does not describe every input and output of a bus protection scheme.
Device-duty analysis has its own IEEE study reference
IEEE 3002.3-2018 explicitly includes fault-current calculation, device-duty evaluation, modeling assumptions, and model validation in its short-circuit-analysis scope. Name that reference for the fault-duty portion of a study package. It provides a more precise description of that deliverable than a blanket requirement to 'perform all studies to IEEE 242.'
Put CT ratios beside the relay settings
A current setting expressed in secondary amperes needs its current-transformer ratio to be meaningful on the primary-system plot. For an 800:5 CT, the ratio is 160, so a 4 A secondary pickup corresponds to 640 A primary. Record the CT nameplate ratio, installed tap, relay input rating, and the units used in the settings export. A bare '4 A' entry is incomplete engineering-to-field information.
How it is used in the field
Two relays each show 4 A secondary pickup. With a 400:5 CT, that represents 320 A primary; with an 800:5 CT, it represents 640 A. These are primary-to-secondary ratio calculations, not pickup values prescribed by IEEE 242. A secondary-injection result verifies the relay response to the injected current; the installed CT ratio, tap, and wiring need their own evidence before that result proves the intended primary-current response.
For a bus-protection package, build a trip matrix naming each input condition, protection zone, output contact, and breaker that must open. Link it to the one-line and control-drawing revisions. The short-circuit study supplies device-duty inputs; the trip matrix exposes a different failure, such as a correctly configured relay operating the wrong breaker.
A procurement package can divide the engineering deliverables into fault duty under IEEE 3002.3-2018, low-voltage breaker application under IEEE 3004.5-2025, and bus or switchgear protection under IEEE 3004.11-2019. Assign responsibility for the shared model and interfaces across those work packages. Explicit work packages put bus logic and field data reconciliation into the bid scope, with a named party responsible for each interface.
Edition history
IEEE 242-2001 superseded IEEE 242-1986 and was published December 17, 2001. The catalog records an ANSI withdrawal date of August 5, 2013 and an IEEE inactivation date of March 25, 2021. IEEE 3004.5-2025 supersedes its own 2014 edition; the older year still appearing in a collection directory does not establish the latest individual publication.
Adoption
Protection obligations arise from the applicable installation requirements and the facility's engineering specification. The Buff Book supplies engineering practice. A complete contract identifies the required protection result, study coverage, approved settings, and field verification instead of using a document nickname as the acceptance criterion.
Frequently asked questions
Is IEEE 3004.5-2014 still the latest breaker practice?
IEEE lists IEEE 3004.5-2025 as active and as superseding the 2014 edition. The 2025 publication also identifies the specific Buff Book breaker chapter included in its coverage.
Can two identical relay ampere settings have different primary pickups?
Yes. Secondary-current settings scale through the installed CT ratio. The CT ratio, selected tap, and relay current basis belong beside the displayed setting and the test result.
Does a correct secondary-injection pickup prove the installed CT ratio?
It proves response at the relay input used for the test. Match the result to separately verified CT nameplate, selected tap, circuit wiring, and relay current basis before assigning the corresponding primary-current pickup.
Sources checked
- IEEE 242-2001: Buff Book scope, edition history, and inactive-reserved status
- IEEE 3004.5-2025: active low-voltage breaker practice, superseded edition, and Buff Book Chapter 7 lineage
- IEEE 3004.11-2019: bus and switchgear fault protection and isolation strategies
- IEEE 3002.3-2018: short-circuit analysis, fault-current calculation, and device-duty evaluation