ASHRAE 90.1: energy compliance paths and the 2025 edition

ASHRAE/IES 90.1-2025 sets minimum energy-efficiency requirements for covered buildings, building systems and site equipment, with low-rise residential exclusions. It governs more than equipment ratings: envelope assemblies, lighting power, controls and selected energy credits contribute to compliance. Choose the compliance path before accepting substitutions. A prescriptive package and a whole-building performance model need different evidence, while mandatory requirements remain part of performance compliance.

Current edition: ANSI/ASHRAE/IES Standard 90.1-2025 (2025)
Updated

Official publisher page

Applies to

Architects, engineers, energy modelers, contractors and code reviewers use the standard across envelope, mechanical, water-heating, power, lighting and other covered work. Owners need the compliance basis when an alteration changes a previously approved assembly or system. Existing buildings are not categorically outside the scope: new systems and equipment within them are expressly addressed.

Residential exclusions include single-family houses and specified manufactured housing, plus multifamily buildings no taller than three stories above grade. Standard 90.1 also covers specified site systems and equipment, so the review boundary does not necessarily stop at the exterior wall. ASHRAE 90.1-2025 published scope

Key topics

Choose a compliance path before accepting substitutions

DOE identifies two whole-building performance options in Standard 90.1: the Energy Cost Budget method in Section 12 and the Performance Rating Method in Appendix G. Performance compliance does not erase mandatory requirements. Record the selected path on the submittal register so a proposed lower-performing component is reviewed against the correct trade-off and mandatory provisions. DOE performance-compliance guidance

The prescriptive package includes energy credits

ASHRAE identifies Section 11 as the energy-credit framework and explains that credits first appeared in the 2022 edition. The 2025 revision expands available strategies and increases required credits by building type. A package assembled only from envelope, equipment and lighting minimums can therefore omit a separate prescriptive obligation. Record the selected credit measures and the evidence each needs. ASHRAE 90.1 edition changes

Lighting power and control requirements need separate proof

The publisher's 2025 change summary distinguishes revised lighting power-density limits from revised controls requirements. Maintain both the connected-load calculation and the control-function evidence. A reduction in connected watts does not by itself demonstrate occupancy response, daylight control or the required operating schedule.

Use savings figures with their stated comparison edition

DOE's March 2024 determination estimates that 90.1-2022 reduces site energy by 9.8% on a weighted national basis compared with 90.1-2019. That estimate is neither a 2025-edition savings figure nor a forecast for an individual retrofit. Identify the compared editions and analysis population whenever the number appears in an owner's energy brief. DOE 90.1-2022 determination

How it is used in the field

Create a compliance register with the adopted edition, approved path, affected system, required evidence and document revision. When equipment is substituted, identify whether the proposed change affects a prescriptive minimum, mandatory control, selected credit or modeled input. One substitution can affect several of those records.

For a modeled design, align the proposed-building inputs with the actual drawings and approved equipment. DOE's review guidance explicitly checks that the proposed design reflects the construction documents and that mandatory requirements are met. Keep the simulation report tied to those revisions; an earlier passing model cannot establish the performance of an undocumented replacement design.

An office lighting package with 72 luminaires rated at 40 input watts totals 2,880 W across 5,000 square feet, or 0.576 W per square foot. Against that project's approved allowance of 0.55 W per square foot, the package exceeds 2,750 W by 130 W before any method-specific adjustments. Put the calculation beside the selected compliance path and keep the control test results separately. The publisher's distinction between power-density limits and controls becomes two reviewable pieces of evidence.

Edition history

ASHRAE reports that 90.1-2025 incorporates 105 addenda. Its changes include revised envelope provisions, equipment metrics, fan-system power procedures, renewable-energy options and building performance factors. Preserve the edition in calculation filenames and model reports so an older metric or factor cannot silently carry into a current submission. Publisher overview of 90.1-2025

Adoption

DOE's affirmative determination for 90.1-2022 initiated state commercial-energy-code review and updating, with certification due March 6, 2026 under its two-year process, unless an extension applies. That federal deadline does not establish a jurisdiction's permit effective date. Record the local adopted edition separately from the publisher's 2025 edition and the standard covered by DOE's determination. DOE state certification requirements and deadline

Frequently asked questions

Can a performance model trade away mandatory controls?

No. DOE describes mandatory requirements as part of performance-compliance review. The model provides flexibility within the selected method; it does not make every provision optional. Identify the mandatory checks separately from simulated energy performance.

Does meeting 90.1 establish acceptable ventilation?

Energy and ventilation requirements must be coordinated. Outdoor-air controls, recovery and dehumidification affect both, but an energy-compliance result does not replace the applicable ventilation calculation and delivered-airflow evidence.