ISO 19650: Information requirements, exchange acceptance and asset records

ISO 19650 is a series for managing information across a built asset's life. Its practical purpose is to connect the information a recipient needs with the parties producing, reviewing and accepting it. The series covers delivery, operations, individual exchanges, security and health-and-safety information through separately published parts. It supplies an information-management framework; the project appointment defines the actual deliverables, acceptance criteria and responsibilities.

Current edition: Parts 1 and 2: 2018; Part 3: 2020; Part 4: 2022; Part 5: 2020; Part 6: 2025
Updated

Official publisher page

Applies to

Owners, information managers, designers, contractors and operations teams use the series when establishing project or asset information requirements. ISO 19650-1:2018 applies across the asset life cycle and is adaptable to projects of different scales and complexity. A small equipment-replacement package therefore needs a proportionate information process, rather than the entire administrative structure of a major campus build. Establish contractual application through the appointment documents and named parts. ISO's Part 1 scope

Key topics

OIR, AIR, PIR and EIR answer different questions

The UK BIM Framework distinguishes organizational information requirements (OIR), asset information requirements (AIR), project information requirements (PIR) and exchange information requirements (EIR). Start with the owner's decision: portfolio reporting, operating an asset, deciding a project issue or receiving a particular delivery. Then state the required attributes and acceptance criteria for that exchange. A request for a model format alone leaves the information need unanswered. UK BIM Framework, sections 3.3 and 3.4

An exchange needs criteria for acceptance, beyond a file upload

ISO 19650-4:2022 addresses the decision process and quality criteria for individual information exchanges during both project delivery and operational trigger events. Define the recipient's decision and the information needed to support it. An equipment package can contain readable files yet fail acceptance because asset identifiers, installed configuration or required attributes do not agree. The exchange review needs evidence of completeness and consistency against the stated requirements. ISO's information-exchange scope

Schedule submission and acceptance as separate events

The UK BIM Framework's April 2020 guidance treats an information exchange as complete when the receiver accepts it, with time allowed between submission and acceptance. Put both events in the delivery plan. If an owner's decision is due on Friday, a Friday file upload leaves no scheduled review or correction period. Agree who reviews the exchange, who accepts it and how a rejected package returns to its author. UK BIM Framework, section 3.4.4.5

Health-and-safety information also belongs in non-BIM work

ISO 19650-6:2025 explicitly permits its health-and-safety information principles and requirements to be applied during delivery or use without BIM. That extends the useful scope beyond a modeling team. A replacement package should preserve relevant hazard information in a form the future maintainer can identify and retrieve. Connect each accepted risk record to the affected asset and its current condition, rather than leaving it inside an obsolete construction presentation. ISO's Part 6 applicability

Select the published parts, with security responsibilities named

ISO's catalogue separates operational information management in Part 3 from the security-minded approach in Part 5. Write their designations into the information requirements where those functions are part of the appointment. Agree who owns access decisions, approves an exchange and maintains the information after the construction team leaves. A platform subscription does not allocate those responsibilities. Security and continued accuracy require named parties throughout the handover. Published series catalogue

How it is used in the field

For a pump replacement package, the owner's exchange requirements call for 12 unique asset tags, each connected to its installed serial number and accepted operating document. A delivery containing 12 rows but one repeated tag has only 11 unique assets represented. Reject the identifier check and return the affected rows for correction. The quantity and checks in this Anvilfield example come from the appointment; ISO 19650 does not prescribe a universal number of attributes or a percentage pass score.

Record separate dispositions for data acceptance and physical acceptance. A correctly identified pump can have a complete information package while its commissioning result remains open. Carry that test status into the asset record with its evidence link and responsible party. When a field substitution changes the serial number or duty, revise the related model object and documents through the same exchange process, preserving the superseded version.

Edition history

As of November 5, 2026, ISO's catalogue retains Parts 1 and 2 from 2018 and Part 3 from 2020 while listing their replacement drafts as under development. Part 4:2022 and Part 6:2025 are published standards. A draft's circulation does not change the edition named in an existing appointment; make any agreed transition explicit.

Frequently asked questions

Does ISO 19650 prescribe a particular software platform?

ISO 19650 organizes information management without selecting a software vendor. An appointment still needs to name the exchange formats, access responsibilities and acceptance checks. A platform capable of storing a model does not establish that the submitted model satisfies those requirements.

Does an accepted information model prove the physical installation passed its tests?

The information acceptance establishes that the exchange satisfies its requirements. The installation's inspection and performance evidence still needs its own acceptance. Link those records to the model so users can distinguish an accepted data package from the technical decisions it records.