UL Standards & Engagement
UL 467: Grounding hardware, rod dimensions, and burial ratings
UL 467 certification identifies grounding electrodes and connection hardware evaluated for their stated use. A purchase description must still resolve nominal size, actual dimensions, conductor range, and earth or concrete exposure. For the cited copper-bonded rod, nVent's nominal 5/8 inch corresponds to 14.2 mm actual diameter. The model record supports that selection; a field resistance measurement instead describes the completed electrode system.
Applies to
The eleventh edition covers electrical and telecommunications grounding connections, intersystem bonding terminations, and other named grounding and bonding equipment. Its installation references include the NEC in the United States, the Canadian Electrical Code, and NOM-001-SEDE in Mexico. Electrical designers and buyers use the product evidence to specify hardware; inspectors and installers match that hardware to its intended connection. The standard's scope also includes grounding electrodes themselves, not only the fittings attached to them. UL 467 scope
Key topics
Nominal ground-rod diameter is not a caliper reading
nVent's ERICO catalog identifies rod 615880 as nominal 5/8 inch, with 14.2 mm actual diameter and a displayed 2.4 m length, and identifies UL certification on that row. The 14.2 mm dimension is about 0.559 inch, so a 0.625-inch caliper acceptance limit would reject the manufacturer's documented nominal size. Match the actual model and certification rather than accepting any undersized rod described as nominal 5/8 inch. The same catalog notes an 8 ft minimum for rods listed to UL 467. Its rounded metric length must not become an instruction to fabricate a rod only 2.400 m long. nVent catalog, printed pages 16 and 17
Coating thickness and stamped identity belong on receiving records
nVent specifies a minimum copper coating of 10 mils for its copper-bonded rods listed to UL 467. Its 615880 catalog row gives 254 micrometers of plating, the metric equivalent of 10 mils. nVent also states that the manufacturer name, length, diameter, and part number are roll-stamped within 12 inches of the chamfered end. Capture that identification while it remains readable. Coating thickness is a manufacturer specification to retain with the product record; surface color or the word 'copper' on a delivery ticket does not establish it. nVent rod construction and marking information
A direct-burial grounding terminal is not a sealed power splice
UL's grounding-terminal guidance separates grounding and bonding equipment in category KDER from sealed wire-connector systems in category ZMWQ. Equipment qualified for earth burial or concrete embedment carries markings for that use; the burial indication can be abbreviated DB. Read the connector's actual certification and marked uses when the connection will be concealed. A direct-burial grounding terminal need not provide the sealed insulation system required for an underground current-carrying splice. For a dual-certified connector, record which category supports each proposed use instead of applying its grounding approval to the feeder conductors. UL Electrical Connections, fall 2019, pages 3 and 4
How it is used in the field
Split the material schedule into actual rod dimensions, coating, certification reference, and connection hardware. For the cited rod, 8 ft converts to 2.4384 m; the catalog's short metric display is not a competing minimum length. Photograph the rod identification before driving and the connector markings before concealment. A receiving record should resolve the nominal-size question while the material is still accessible.
For substitution review, compare intended use as well as geometry. A connector supplied for grounding, a sealed conductor splice, and a lightning-protection fitting can occupy different certification categories. UL Solutions evaluates lightning-protection components under UL 96 and grounding and bonding equipment under UL 467. A shared material or mounting shape does not transfer those evaluations.
At each concealed connection, retain the product sheet and an image tying the connector to its installed location. Verify the documented conductor material, permitted size and count, and tightening instructions for that model. A clamp that accepts the rod diameter still needs approval for the attached conductor and exposure. Keep later electrode-resistance measurements with the system test record; they answer a different question from the clamp's product certification.
Frequently asked questions
Does every copper-colored rod have the same plating?
No. Specify the actual model and its documented coating thickness. The cited nVent catalog contains multiple rod constructions and plating values; its 10-mil statement applies to the identified UL-listed copper-bonded products.
Where can an inspector verify a connector category?
UL's published guidance directs users to Product iQ and identifies searches by file number, manufacturer, model, or category. Retain the matching model record with the submittal, since a manufacturer's broader catalog can contain products evaluated for different uses.
Sources checked
- UL Standards & Engagement: UL 467, eleventh edition, April 29, 2022
- nVent ERICO: catalog E1339C-UKEN, printed pages 16 and 17, nominal dimensions, coating, markings and rod-length note
- UL Electrical Connections: direct-burial grounding terminals, fall 2019, pages 3 and 4
- UL Solutions: Grounding and Lightning Protection Component Certification