National Fire Protection Association (NFPA)

NFPA 75: IT fire protection, immersion fluid evidence and equipment changes

NFPA 75-2024 addresses fire protection for information technology equipment and its rooms, including damage from smoke, heat, corrosion and water. Owners, designers and fire officials use it to connect equipment choices with room protection and recovery planning. The 2024 edition adds immersion-cooling provisions, off-gas detection provisions and optional fire-test guidance. For an immersion project, the useful submittal distinguishes the evaluated fluid, complete cooling system and approved room arrangement.

Current edition: NFPA 75, 2024 edition
Updated

Official publisher page

Applies to

Owners and designers use NFPA 75 to establish the fire-protection basis for identified IT equipment and rooms; inspectors compare the installation with that basis. The governing code and project specification determine its enforceable edition. Keep the room's occupancy and egress decisions alongside the equipment protection decisions, since neither substitutes for the other. Use the data center fire review to identify interfaces with detection, suppression and emergency controls. Official NFPA 75 scope

Key topics

A fluid certificate does not identify the complete tank system

NFPA 75-2024 adds provisions for IT immersion cooling equipment. For a tank submittal, obtain both the fluid's identity and the evidence covering the assembled cooling equipment. UL Solutions describes UL 2417 as an evaluation of immersion fluids, including flash point, autoignition temperature and dielectric properties; it treats the fluid as a component of the end product. A fluid certificate therefore answers a different question from evidence for the tank, its controls and the intended IT equipment. Match the exact fluid designation to the equipment documents, including restrictions on substitution. NFPA's immersion revision and UL's fluid certification scope

Specify the evidence behind an optional fire test

NFPA 75-2024 introduces Annex F using optional test material from NFPA 76. Identify the purpose of a proposed test, the equipment arrangement it represents and the acceptance basis agreed for the project. Annex F is optional guidance, not a blanket demand that every data center perform the same fire test. A project that selects its test method still needs an acceptance basis tied to the proposed arrangement. Record which design decision the evidence supports, including the arrangement and operating conditions represented by the tested equipment. Publisher's Annex F description

Keep off-gas and battery requirements on distinct schedules

NFPA 75-2024 adds off-gas detection provisions while transferring lithium-ion battery requirements to NFPA 855. Those are separate scope changes. List the detection equipment and its intended function in the IT protection documents, and identify the battery installation's applicable storage standard separately. Removing battery text from the IT standard does not remove the battery from the project review. Coordinate the equipment schedule and the storage compliance package so a battery substitution does not pass unnoticed as a routine IT purchase. NFPA's description of both changes

How it is used in the field

Compare an immersion-cooling purchase across three documents: the tank equipment schedule, the fluid identification and the supporting evaluation report. A tank model approved with one fluid does not inherit an approval for a substitute merely because the substitute's published flash point is higher. Ask the supplier to identify whether the submitted system evidence covers the proposed pairing. That question produces a useful acceptance decision before filling the tanks.

An equipment substitution review should list the changed tank model, fluid formulation, operating limits and protection interfaces. Retain unchanged records by reference, then identify the evidence that must be renewed. This lets the owner trace a later fluid delivery or replacement controller to the actual accepted configuration without reopening every room drawing.

Before owner acceptance, connect the fire-protection documentation to the continuity and recovery plan. Record the protection functions that must be restored after an incident and the information needed to determine which equipment returns to service. The maintenance team should inherit the approved technical basis, rather than only the component manuals.

Frequently asked questions

Does UL 2417 fluid certification approve an immersion cooling installation?

UL 2417 evaluates the fluid. UL Solutions separately describes evaluation of the immersion system and its fluids against applicable requirements. Keep fluid evidence, system evidence and the room's NFPA 75 design decisions identifiable in the submittal; one certificate does not describe all three.

Does an Annex F test approve every room using the tested equipment?

The report supports the arrangement, conditions and design question it addresses. Preserve that relationship in the project approval record. A different room arrangement needs its own documented disposition of the applicable protection requirements.

Where can the current NFPA 75 edition be read or obtained?

NFPA's official document page identifies the current edition and provides its access and purchase options. Use the 2024 product description to identify the principal revisions, and the project edition for the requirements applied to the installation.