ANVILFIELD Try FieldOS

UL Standards & Engagement

UL 1741: Inverter certification and interconnection evidence

Inverters and interconnection equipment use UL 1741 to establish evaluated product safety and applicable operating functions for distributed energy resources. Its scope includes stand-alone and grid-interactive equipment, as well as rapid-shutdown equipment and systems. The current standard is edition 3, published in 2021 and revised August 14, 2026. A useful acceptance package identifies the certified model, applicable supplements, evaluated functions, and utility requirements rather than relying on a generic inverter-listing statement.

Current edition: UL 1741, edition 3 (2021), revised August 14, 2026
Updated

Official publisher page

Applies to

UL 1741 covers inverters, converters, charge controllers, interconnection equipment, and specified combinations with distributed sources. Interactive equipment uses IEEE 1547 for interconnection requirements and IEEE 1547.1 for conformance testing alongside UL 1741. Laboratories establish product certification; designers match the certified functions to the project; utilities accept the operating profile; inspectors review installation. Tie the PV wiring guide to the ordered inverter model so circuit drawings, product records, and approved settings describe the same equipment. UL 1741 scope

Key topics

Supplement SB belongs on the certification document

The California Energy Commission's March 2022 list guidance requires certificates identifying UL 1741 third edition including Supplement SB, IEEE 1547-2018, IEEE 1547.1-2020, and the source requirements used for testing. The dated signature or stamp must come from an NRTL whose OSHA scope of recognition includes UL 1741. Check that standard-specific recognition as well as the laboratory's name. These are CEC equipment-list documentation criteria; a utility's project approval remains a separate deliverable. CEC certificate criteria, page 6

What changes between Supplement SA and SB evidence?

CEC's March 2022 comparison marks anti-islanding and voltage and frequency ride-through as tested for SB where its SA column calls for confirmation. It also identifies SB tests for functions such as volt-var and frequency-watt control. Ask the supplier which evaluated functions the certificate covers, then reconcile those with the utility-required operating profile. The same enclosure or a familiar SA product name does not establish SB coverage for the ordered model. CEC comparison of SA and SB evidence, page 9

Model suffixes and wildcards can change what is covered

CEC's guidance requires the certificate to identify the requested model numbers, define every model-number wildcard, and identify the inverter as grid-support utility-interactive equipment. Carry that identity into the purchase order and delivered-equipment record. Similar product names or enclosure sizes do not establish identical evaluated functions. If the certification information identifies a particular configuration, preserve that configuration and its associated settings or software evidence in the submittal. CEC model-identification requirements

Rapid-shutdown evidence has a different purpose from grid support

UL 1741's public scope includes both rapid-shutdown equipment and systems. That scope does not make a grid-support certificate the evidence for a particular rapid-shutdown combination. Obtain the product's specific rapid-shutdown documentation, supported equipment combination, installation instructions, and identification used at turnover. Keep it alongside the grid-interaction certificate under the same site asset record so replacing an inverter does not silently change the documented rapid-shutdown arrangement. UL 1741 rapid-shutdown scope

How it is used in the field

Separate the submittal into product identity, evaluated grid functions, utility-required operating profile, and installation evidence. Record which document establishes each item. A test certificate demonstrates evaluated functions; the utility-approved profile identifies the settings for this interconnection. Neither a factory default nor an installer-selected profile establishes the utility's acceptance.

At commissioning, reconcile the installed model, software or firmware identification where applicable, selected grid profile, protection settings, and communications configuration with the approved documents. Preserve exported settings and dated screenshots with the test results. Later service can then restore the accepted configuration instead of reconstructing it from a generic manual.

Keep power-conversion certification separate from storage-system and battery certification. ULSE's August 14, 2026 revision summary expands medium-voltage requirements and adds references to UL 1973 and UL 9540. Those additions reinforce the need to identify the actual evaluated equipment combination; an inverter certificate alone does not establish the safety evaluation of an entire storage installation. ULSE's current revision summary

Edition history

Third edition was published September 28, 2021. Its current revision is dated August 14, 2026. Record both the standard edition and the revisions or supplements identified by the certification body. Publication of a revised standard and certification of a particular product are separate events.

Adoption

CEC uses the certificate evidence described above for its grid-support inverter and energy-storage equipment lists. Utilities and interconnection authorities establish their own applicable approval requirements. UL 1741 product certification supports that review, while NEC installation compliance and the utility's permission to operate have their own acceptance records.

A contractor tracking additions to an installed solar fleet can use PorchRocket Asset Search for imagery-based monitoring that reports new, removed, or altered visible arrays with dated views.

Frequently asked questions

Does stand-alone UL 1741 certification permit utility export?

The standard covers both stand-alone and interactive equipment. Establish that the product's actual certification includes the required grid-interactive functions, then reconcile it with the utility's interconnection requirements and approved operating profile.

Why retain the certificate when the inverter already has a label?

The certificate identifies the evaluated model family, supplements, and test references in more detail than a general product claim. CEC's model and wildcard requirements show why this matters: the exact ordered suffix must be within the stated coverage.

Sources checked

Field guides that apply UL 1741

Browse all codes and standards