AmericanHort
ANSI Z60.1: its Z60.2-2025 successor and complete nursery stock orders
Nursery stock orders that still cite ANSI Z60.1 need an edition check: AmericanHort now publishes the American Standard for Nursery Stock as ANSI Z60.2-2025. It standardizes plant measurements, size intervals, root-ball relationships, and container classes for commercial transactions. Container class alone usually leaves a woody plant's size unspecified. State both the required plant size and container class, then identify the edition the buyer and supplier have agreed to use.
Applies to
Growers, distributors, landscape architects, estimators, installers, and purchasing agencies use the standard to describe traded nursery stock. AmericanHort's FAQ expressly excludes retail consumer transactions from its intended application.
Supplier quotations become comparable when the planting schedule identifies both stock size and production method. Resolve omitted measurements before ordering so a delivery dispute can be decided from the accepted description.
Key topics
Name the successor instead of inventing a Z60.1-2025 edition
AmericanHort identifies the 2025 revision as ANSI Z60.2, following ANSI Z60.1's 2014 edition. The published standard's cover gives April 17, 2025 as its approval date. Retain a contract's specific older reference until the parties accept a change, and show the successor explicitly in new stock schedules. AmericanHort's publication page provides the current download and revision history.
Container class and plant size are separate specifications
ANSI Z60.2-2025 requires plant size by the appropriate caliper, height, or width, together with a container class for container-grown stock. It allows container-class-only descriptions for specified groups of perennials and tender deciduous shrubs. A woody-plant schedule reading only #5 does not acquire a minimum plant height from a recommended container table. Resolve the missing size at procurement, rather than imposing an unstated height at delivery.
A #5 container is a volume class, not exactly five gallons
ANSI Z60.2-2025 assigns #5 containers a volume range of 785 to 1,242 cubic inches. That is approximately 3.40 to 5.38 US gallons using 231 cubic inches per gallon. Two containers within that class can therefore have visibly different dimensions. Inspect the specified class and plant size separately; a familiar-looking pot or a nominal gallon description does not establish both.
The 2025 caliper rule changes measuring height at 4.5 inches
Under ANSI Z60.2-2025's general caliper rule, take the first reading 6 inches above the field ground line, container soil line, or bare-root flare, as applicable. If that reading reaches 4.5 inches, take the caliper measurement at 12 inches instead. A 4.2-inch reading therefore remains measured at the lower position. Apply the plant group's specific measurement rule where one is provided, and record the measuring height with the receiving inspection rather than treating two diameters taken at different heights as interchangeable.
A stated minimum identifies a bounded size interval
ANSI Z60.2-2025 describes a 2.5-inch-caliper Type 1 shade-tree specification as the 2.5-inch to less-than-3-inch interval. The stated number is its lower bound, not a demand for one exact diameter. Use the applicable plant type's intervals when comparing supplier offers and delivered material. Root-ball and container relationships must follow that plant group, rather than a single multiplier applied to every growth habit.
How it is used in the field
Audit the purchase schedule before requesting nursery quotes. Confirm botanical identity, plant type and growth habit, required plant size, production or packaging method, quantity, and the agreed standard edition. Those details make alternate offers comparable and reveal substitutions that change handling or planting labor.
An order for forty #5 shrubs with a 24-inch minimum height has two acceptance questions: whether the containers meet the #5 class and whether the plants meet the stated height interval and type requirements. A delivery in compliant containers with plants below the ordered minimum remains a plant-size discrepancy. Photograph the measurement and retain the supplier's accepted substitution, if any.
At receiving, match tags and measured stock to the schedule item before plants are distributed around the site. For the specified 2.5-inch Type 1 caliper interval, a 2.9-inch tree remains in that interval; a 3.0-inch tree enters the next one. Record any accepted size substitution and its root-ball or container requirements. Then carry the accepted stock IDs into the planting and establishment records.
For estimator comparisons, keep stock price and installation effort connected to the same accepted description. A change from container-grown to balled-and-burlapped stock is also a change in handling, access, and planting scope; equal plant names do not make the delivered packages interchangeable.
Edition history
The maintained URL remains a useful home for searches using Z60.1, but the current document is Z60.2-2025. AmericanHort's webpage and FAQ describe the renumbering; the downloadable standard supplies the actual plant groups, measurement rules, and size relationships.
Adoption
AmericanHort describes voluntary commercial use that becomes a contract obligation when the parties agree to it, and notes incorporation in government requirements. Name the edition in the purchase documents. Its FAQ also distinguishes the standard's sizing purpose from a comprehensive plant-quality guarantee; write any additional health, form, or warranty requirements into the order.
Frequently asked questions
What replaced ANSI Z60.1-2014?
AmericanHort publishes the successor as ANSI Z60.2-2025. The current publication changes the designation as well as the edition year, so Z60.1-2025 is not the title shown on its cover.
Can a #5 plant be rejected just because its pot holds less than five gallons?
AmericanHort's #5 class allows 785 to 1,242 cubic inches. A 900-cubic-inch container, about 3.90 US gallons, falls within that class. Check the ordered plant size as well as the container; a separate exact-volume requirement must be stated in the purchase description.
Does this standard set the planting warranty?
It provides the commercial sizing and description system. The purchase and landscape specifications must state the project's establishment duties, acceptance conditions, and warranty.