ANVILFIELD Try FieldOS

ASTM International

ASTM C33: aggregate grading, fineness modulus and bedding sand

ASTM C33/C33M-24a specifies grading and quality for fine and coarse concrete aggregate, excluding lightweight and heavyweight aggregate. Approval needs more than a sieve curve: identify the source, selected grading and evidence for the relevant durability and impurity limits. For sand, fineness modulus helps track source consistency. When C33 sand is ordered for paver bedding, the hardscape specification adds its own fines, degradation and drainage criteria; those additions are not interchangeable with concrete-aggregate compliance.

Current edition: ASTM C33/C33M-24a (2024)
Updated

Official publisher page

Applies to

Aggregate purchasers, concrete producers, laboratories and hardscape specifiers use C33 to define the supplied material. The mix-design guide explains aggregate proportioning. The paver layout guide identifies concrete sand for bedding. Product acceptance adds the source-specific quality evidence and any tighter limits required for the intended service.

Key topics

A grading certificate does not cover every quality property

ASTM C33/C33M-24a identifies separate evaluations for grading, organic impurities, soundness, clay lumps and friable particles, abrasion and aggregate reactivity. Match the submitted tests to the selected material and exposure. A grading curve that falls inside its envelope cannot establish that the same aggregate is free of harmful contamination or has the required durability. Keep the source and product designation with each report.

Read fineness modulus as both a range and a source trend

FHWA-HRT-15-034 identifies 2.3 to 3.1 as the C33 fineness-modulus range for fine aggregate. FHWA Technical Advisory T 5080.17 (1994) separately recommends limiting variation to 0.20 from the source value. A delivery at 3.02 lies inside that broad range but differs by 0.32 from an approved baseline of 2.70. Flag that source change for mixture review instead of approving it from the broad range alone.

The paver bedding fines limit is an added requirement

CMHA PAV-TEC-017-22 recommends no more than 1% passing the No. 200, 0.075 mm sieve for bedding sand. Its performance-based selection discussion also allows more fines when degradation and permeability recommendations are met. A purchase specification that fixes a 1% maximum still requires approval before accepting a different basis. Write both the fines limit and any allowed performance alternative into the order; the words 'C33 sand' do not resolve them.

Vehicular bedding also needs degradation and drainage evidence

CMHA PAV-TEC-017-22 recommends a maximum 8% Micro-Deval degradation and a minimum permeability of 2.8 inches per hour for its vehicular bedding-sand selection framework. These properties address different failure paths: particles breaking into fines and water failing to leave the bedding. Its recommendations concern heavy vehicular service, so identify the application and selected criteria rather than adding an unexplained C33 stamp to the paving detail.

How it is used in the field

A bedding-sand report shows 0.8% passing No. 200 and 10% Micro-Deval degradation. It clears a selected 1% fines limit but exceeds a selected 8% degradation limit. Accepting the material on the first value alone would omit the second requirement. Conversely, a low degradation result does not establish permeability. Review each specified property against its own test evidence.

At 0.8% passing No. 200, a 1,000-gram dry sample has 8 grams in that fraction; at 1.2%, it has 12 grams. The second result exceeds a specified 1% limit. If the designer selected CMHA's performance alternative, attach the degradation and permeability evidence to the approval instead of silently waiving the fines result. A visual handful of sand cannot establish either acceptance route.

Build an aggregate approval register by source and product, with the grading report and the required quality tests listed separately. When a delivery comes from another pit or a different product stream, compare its identity with the approved submission before combining stockpiles. Otherwise, good paperwork from the original source remains attached to material it never represented.

For concrete purchasing, record the nominal maximum size and any specific grading requirements in addition to C33. ASTM assigns mixture proportioning and approved blending to the party proportioning the concrete. Aggregate supply compliance does not by itself approve a changed fine-to-coarse proportion or a different mixture recipe.

Frequently asked questions

Does C33 require every manufactured sand to be rejected?

No. ASTM’s scope includes manufactured sand as well as natural sand and blends. Determine whether the actual product meets the specified grading, quality and application requirements rather than deciding from the word manufactured.

Is C33 a lightweight aggregate specification?

No. Its scope excludes lightweight and heavyweight aggregates. Establish the aggregate category before assigning the specification; the material’s separate lightweight qualification cannot be replaced by a conventional C33 sieve report.

Sources checked

Field guides that apply ASTM C33

Browse all codes and standards