ANVILFIELD Try FieldOS

IEEE Standards Association and ASHRAE

IEEE 1635: battery ventilation calculations and input limits

Battery ventilation design crosses the boundary between the electrical battery specification and the mechanical room design. IEEE/ASHRAE 1635-2022, also identified by ASHRAE as Guideline 21-2022, connects those disciplines. It covers vented lead-acid, VRLA, vented and partially recombinant nickel-cadmium, and lithium-ion stationary installations. The guide addresses operating modes, associated hazards, ventilation, and thermal management; the battery's chemistry and charging condition determine which inputs belong in each calculation.

Current edition: IEEE/ASHRAE 1635-2022 and ASHRAE Guideline 21-2022 (2022)
Updated

Official publisher page

Applies to

Electrical designers, HVAC designers, battery suppliers, commissioning teams, and owners use the joint guide to exchange usable battery data. A mechanical schedule needs more than nominal battery kWh: it needs the chemistry, number of cells, parallel strings, capacity-rating basis, operating modes, charging characteristics, and heat-release data.

The battery room safety guide explains room hazards, detection, and interlocks. This reference concentrates on the calculation inputs and interface records that establish what the ventilation and cooling systems were actually sized to handle.

Key topics

IEEE 1635 and ASHRAE Guideline 21 identify the joint publication

ASHRAE's publications catalog identifies Guideline 21-2022 with IEEE Standard 1635-2022. They are paired publication identifiers for the ventilation and thermal-management guide, rather than two unrelated calculations to be added together. The electrical and mechanical submittals should identify the same edition and battery configuration so reviewers can trace the data exchange between them.

Name the airflow method and the capacity-rating basis

ABB's UPS Battery Handbook attributes Q = 0.05 × n × Igas × Crt × 0.001 m³/h to EN 50272-2; this is a separately identified method, not an equation attributed to IEEE 1635. Here n counts cells, Igas is gas-producing current in mA/Ah, and Crt is lead-acid C10 capacity in Ah rated to 1.80 V per cell at 20°C. A capacity printed for another temperature or endpoint is a different input.

The 1 and 5 mA/Ah figures describe bounded float cases

ABB's reproduced EN 50272-2 table assigns 1 mA/Ah to VRLA and 5 mA/Ah to vented lead-acid with antimony below 3 percent for float charging. Its accompanying text limits those values to IU or U charging and operating temperatures up to 40°C. Identify chemistry, alloy, charging regime, and temperature before using that five-to-one comparison; boost and abnormal operating cases need their own inputs.

Routine lithium operation and thermal runaway are separate cases

IEEE's 1635-2022 scope states that hydrogen generation is not a normal-operating concern for lithium-ion batteries but is a concern under thermal-runaway conditions. A normal-operation gas calculation therefore does not characterize the abnormal event. Likewise, room sensible cooling needs the applicable heat-release data; battery discharge power delivered to an external load is not automatically heat released into the battery room.

How it is used in the field

For 240 VRLA cells, each rated 1,000 Ah on the stated C10 basis, ABB's float input gives 0.05 × 240 × 1 × 1,000 × 0.001 = 12 m³/h, about 7.1 cfm. Two identical strings give 24 m³/h, about 14.1 cfm. Label that line 'EN 50272-2 method, VRLA float' and retain the other operating cases and governing code path beside it. The selected room exhaust duty follows the complete design schedule.

Distinguish cells from blocks on the data sheet sent to the HVAC designer. EnerSys's Blue+ instructions identify six cells in a 12 V monobloc, so 40 blocks represent 240 cells. Using block count in n would divide the calculated duty by six. Include the series and parallel arrangement from the battery system selection record so another reviewer can reproduce the count.

Reconcile the installed cell model, string arrangement, and charger program with the calculation inputs. The battery room commissioning guide covers the fan, detection, and alarm demonstrations. Retain the measured airflow at each design operating mode with the battery case it serves, rather than attaching one fan reading to several different charging conditions.

A later battery replacement needs a revised mechanical input sheet when chemistry, capacity, cell count, charging regime, or manufacturer heat-release data change. Retain the old and new calculation revisions with the equipment register. This makes the cooling and ventilation consequences of an electrical change visible to the owner rather than leaving them buried in a battery purchase order.

Edition history

IEEE/ASHRAE 1635-2022 superseded the 2018 edition. IEEE records approval on September 21, 2022 and publication on November 30, 2022. ASHRAE's corresponding identifier is Guideline 21-2022; record both identifiers when electrical and mechanical specifications use different publisher conventions.

Adoption

The joint guide provides the engineering basis for battery ventilation and thermal design. The project code analysis establishes the required room provisions and final acceptance duties. Identify the guide edition, manufacturer data revision, and governing code basis in the mechanical submittal so the selected airflow has a traceable origin.

Frequently asked questions

Can the float-airflow result be used as the final exhaust duty?

Carry it into the design as one named operating case. The final selection also uses the other charging and abnormal cases and the adopted code path. ABB attributes the equation used here to EN 50272-2; the input sheet should preserve that method identity and its capacity, temperature, and charging conditions.

Do IEEE 1635 and Guideline 21 require two separate ventilation designs?

The 2022 identifiers refer to the joint guide. One coordinated design should identify its battery cases and use the same configuration data across the electrical and mechanical submittals.

Sources checked

Field guides that apply IEEE 1635

Browse all codes and standards