IEEE 1106: vented nickel-cadmium battery practice
IEEE 1106-2015 is the latest published IEEE practice for stationary vented nickel-cadmium batteries, including partially recombinant designs; its status changed to inactive-reserved on March 26, 2026. It supports installation planning and decisions about battery upkeep, performance tests, and replacement. Identify the cell model before using it: reduced watering does not change the chemistry, and charger voltage, temperature compensation, and commissioning charge must follow the applicable product instructions.
Applies to
Battery technicians, UPS commissioning teams, station maintenance departments, and engineers use this reference when the installed battery is vented nickel-cadmium. Start the work order with the actual cell model and construction. A cabinet exterior or a generic 'sealed battery' asset description is insufficient to select the maintenance basis.
Give each nickel-cadmium string its own cell model, serial-number range, charger configuration, and instruction revision in the asset register. The battery monitoring guide covers the wider monitoring system. Its lead-acid alarm templates need a separate product review before being assigned to a nickel-cadmium channel.
Key topics
Partially recombinant cells still fall within the vented scope
IEEE explicitly includes partially recombinant nickel-cadmium cells in the 2015 document. Reduced water consumption does not turn one of those cells into a valve-regulated lead-acid battery. Identify its vent arrangement, electrolyte markings, connector hardware, and manufacturer instructions when assigning inspection tasks. This also prevents a battery database from silently substituting a different chemistry's checklist after a cabinet replacement.
A hydrometer does not measure Ni-Cd state of charge
Saft's November 2023 Uptimax instructions state that electrolyte density indicates neither state of charge nor state of health in those nickel-cadmium cells. A lead-acid specific-gravity column therefore adds no useful charge verdict to an Uptimax inspection sheet. Reserve the condition assessment for the applicable electrical performance evidence, and identify electrolyte level separately from an attempted density-based capacity estimate.
Uptimax float voltage includes a temperature characteristic
Saft's Uptimax UP1 instructions allow 1.39 or 1.42 V per cell for single-level charging or the float stage of two-level charging, with a tolerance of ±0.01 V per cell; boost is 1.45 ±0.01 V per cell. At the 1.39 V setting, Saft requires a 3 mV per cell increase per degree below 20°C down to -20°C, with no compensation from 20°C to 40°C. The 1.42 V choice uses 2.5 mV per cell per degree, increasing below 20°C and decreasing above it over the same temperature range.
Storage age and immediate capacity decide the commissioning charge
Saft requires a commissioning charge for filled-and-charged Uptimax cells stored over six months and up to two years, and for filled-and-deep-discharged cells stored up to two years. Its storage ceiling is 24 months from manufacture. Filled-and-charged cells stored up to six months normally need one to three months on float to reach full performance; immediate published performance calls for the commissioning-charge procedure. Record shipment condition and manufacturing date with the acceptance duty.
How it is used in the field
For a 100-cell UP1 string using Saft's 1.39 V setting, the nominal float total at 20°C is 139 V. At 10°C, the required increase is 100 × 10 × 0.003 = 3 V, giving 142 V before applying the stated tolerance. A 139 V reading is therefore not enough to approve the charger without the temperature and selected characteristic. Attach both to the UPS commissioning hold-point record.
During a charger replacement, retain the outgoing configuration and compare it with the approved UP1 charging mode. Verify the replacement's temperature-sensor location, compensation slope, permitted range, and boost control against the selected instructions. Export the settings with the observed cell temperature and measured battery voltage so the next service visit can distinguish a temperature response from setpoint drift.
Keep the battery acceptance result separate from the UPS transfer trace. Record which string supported the transfer, its charge history, and the load at that time; then link its performance evidence to the battery testing work order. A successful brief transfer does not establish the autonomy promised for a longer discharge.
Edition history
IEEE 1106-2015 superseded the 2005 edition and was published November 16, 2015. The publisher lists an active P1106 revision project alongside the inactive-reserved 2015 publication. A project authorization identifies work in progress; it does not supply a released replacement edition for a maintenance contract.
Adoption
The maintenance contract, battery procurement specification, or station procedures identify where IEEE 1106 applies. Its document status does not rename the installed chemistry. Record the referenced edition and the cell manufacturer's instruction revision so future work uses a traceable battery-specific basis.
Station battery contractors use PorchRocket Bid Control to track charger and string renewals in public capital plans before the bid package is issued.
Frequently asked questions
Is IEEE 1106-2015 still the latest published edition?
Yes. IEEE lists the 2015 edition as inactive-reserved and shows P1106 as a revision project. As of November 5, 2026, the project is distinct from a published replacement.
Can freshly delivered Uptimax cells meet full capacity immediately?
Shipment condition and storage history decide the charging route. Saft permits immediate use of filled-and-charged cells stored up to six months, but specifies commissioning charging when full published performance is needed immediately. Carry that distinction into the acceptance schedule.