NFPA 10: Extinguisher service clocks, records and the 2026 edition
NFPA 10 gives owners and service contractors the basis for deciding which portable extinguishers a hazard needs and when each unit needs attention. The current edition is 2026. Track inspection, annual maintenance, internal service and hydrostatic testing as separate events. The agent and cylinder construction determine which longer service intervals apply; a current annual tag does not establish that the cylinder's pressure-test history is current.
Applies to
An extinguisher inventory should identify the actual unit, agent, cylinder construction and service history. Those attributes determine the applicable service and test work. Keep portable units separate from the fixed kitchen suppression system and its service record. NFPA 10 addresses the portable equipment; the hood system's technical requirements and the employer's workplace duties have their own governing documents. NFPA's standard scope
Key topics
Six-year internal service applies to a defined extinguisher type
OSHA 29 CFR 1910.157(e)(4) requires six-year maintenance for rechargeable stored-pressure dry-chemical extinguishers that require a twelve-year hydrostatic test. The rule exempts nonrefillable disposable containers and restarts the six-year interval after recharging or hydrostatic testing. A due-date register therefore needs the service event as well as the cylinder identity. Do not assign every extinguisher the same internal-service interval just because the units occupy one building. Official federal regulation
Five-year and twelve-year hydrotests depend on the cylinder
OSHA 1910.157 Table L-1 assigns a five-year hydrostatic interval to carbon-dioxide extinguishers and to dry-chemical extinguishers with stainless-steel shells. Stored-pressure dry-chemical units with mild-steel, brazed-brass or aluminum shells have a twelve-year interval. Identify the shell construction as well as the agent before assigning a due date. A blanket dry-chemical equals twelve years rule would put the stainless-steel units on the wrong schedule. OSHA's published interval table
Annual maintenance and hydrostatic tests retain different records
OSHA 1910.157(e)(3) retains the annual-maintenance date for one year after the last entry or the shell's remaining life, whichever is shorter. OSHA 1910.157(f)(16) retains hydrostatic-test certification until the next required retest or removal from service, whichever comes first. That certification records the unit identifier, test date and tester's signature. Preserve those event records separately so a current service tag does not conceal a missing cylinder-test history.
The 2026 inspection option needs its own program basis
NFPA's 2026 summary identifies a performance-based inspection option. Amerex's Spring 2026 explanation of Section 7.2.5 specifies written technical justification, third-party evaluation acceptable to the authority having jurisdiction (AHJ), and AHJ approval; inspection intervals cannot exceed 90 days. Amerex also identifies review every three years, or earlier after a hazard, occupancy or ownership change. OSHA 1910.157(e)(2) still imposes monthly visual inspection where it applies. AHJ acceptance of the NFPA option does not itself waive that separate federal duty. Amerex's 2026 implementation explanation, page 17
How it is used in the field
Build the register by serial number or another durable unit identifier, with location recorded separately. A unit moved between rooms keeps its cylinder and service history. When a contractor exchanges it, record the outgoing and incoming identities and transfer the replacement's evidence. Otherwise, a location-based log can attach the old extinguisher's test date to a different cylinder.
For a qualifying twelve-year-test stored-pressure dry-chemical unit recharged on May 8, 2024, OSHA's six-year restart rule gives May 8, 2030 for the next scheduled six-year maintenance event. If its documented hydrostatic test was May 8, 2020, that separate twelve-year interval reaches May 8, 2032. These Anvilfield date calculations show why recharge resets one clock without resetting the cylinder-test clock. Damage or other conditions requiring earlier action still need their own disposition.
Specify the return documents when ordering service: unit identifiers, completed work, unresolved defects, replacements and the evidence for the next due dates. Reconcile that file with the site inventory after the visit. The hood-service report should identify its fixed-system scope separately from any portable-extinguisher work completed during the same attendance.
Frequently asked questions
Does annual maintenance mean opening every stored-pressure unit?
OSHA 1910.157(e)(3) distinguishes the annual maintenance check from an internal examination and says stored-pressure extinguishers do not require an internal examination for that annual check. Scheduled internal maintenance, recharge and cylinder testing remain separately identified events.
Does an annual tag replace hydrostatic-test certification?
The records document different work and have different retention periods. Associate the cylinder's test certification with the actual unit identifier and retain it for its required period. A tag showing an annual visit does not establish that the cylinder passed its required pressure test.
Does the kitchen hood service interval govern the portable Class K unit?
The fixed suppression system and portable extinguisher need separately identified service scopes and records. Coordinate the visits where practical, but preserve each device's governing requirements and event history.