UL 325: Gate entrapment protection and operator certification

UL 325 governs the safety evaluation of powered door and gate operators and their protective accessories. A gate review must establish protection at each entrapment zone, monitoring of the external devices, and the permitted response to a device fault. Commercial door controls and residential garage-door rules have different triggers. The active seventh edition dates from 2017 and includes the September 15, 2025 revision for battery-powered equipment and other operator requirements.

Current edition: ANSI/CAN/UL 325, seventh edition (2017), revised September 15, 2025
Updated

Official publisher page

Applies to

UL 325 covers opening and closing appliances rated 600 V or less in ordinary locations, including operators, complete assemblies, and external entrapment-protection accessories. Designers specify the equipment category; installers assemble the documented configuration; inspectors review its listing and use. UL Solutions identifies gate-operator listing requirements in the 2024 IBC, IRC, and IFC. The adopted code establishes the project's requirement, while the operator documentation identifies the permitted equipment arrangement. Publisher scope; UL code-authority guidance

Key topics

Separate gate-zone coverage from commercial door controls

UL Solutions' seventh-edition summary requires two independent protective means at each automated-gate entrapment zone. Price the devices against a drawing of their coverage: a pair of sensors on the equipment list does not establish that every hazardous location is covered. UL also describes monitored external protection, with a failed device restricting affected gate travel to constant-pressure operation. For commercial doors, the same summary identifies external floor-level protection when closing is commanded by a timer, remote, loop, or another control beyond constant pressure. These are different acceptance cases. Organize the quotation by opening type and control mode so one garage-door test form does not stand for every powered opening. UL seventh-edition protection summary

Which battery-backup parts belong in the operator submittal?

The September 2025 UL 325 revision adds Supplement SC for battery-powered appliances and covers replaceable and nonreplaceable batteries. Obtain the approved operator, battery, and charger combination, with the required behavior during power loss and restoration. CPSC's October 30, 2026 direct final rule also updates 16 CFR Part 1211 for residential garage-door operators, with a scheduled December 29, 2026 effective date unless withdrawn following significant adverse comments. CPSC describes verification at full battery charge and the manufacturer's lowest operating voltage. For procurement, distinguish the published UL revision from this federal rule's effective date, and require the supplier to identify the battery-power tests supporting its residential product. Publisher revision; CPSC direct final rule

Keep UL 294 access-control evidence with its own equipment

UL Solutions distinguishes UL 294 access-control evaluation from UL 325 operator evaluation. UL 294 addresses access-control units and such matters as communication security, endurance, and standby power; UL 325 addresses the powered opening equipment. A gate command that works from a card reader proves an interface function, not the certification of the combined installation. Divide the submittal so the reader, access controller, operator, and protective accessories each have an identified supplier and evidence. Then document the interface behavior instead of allowing either supplier's certificate to stand for the other supplier's scope. UL explanation of the two standards

Residential garage-door rules have a federal manufacturing trigger

CPSC's additional residential garage-door entrapment requirements apply to openers manufactured on or after January 1, 1993 for sale in the United States. The CPSC announcement also explains manufacturer certification and test records. Identify an existing opener's manufacture date during a replacement survey. That federal product trigger is distinct from a commercial gate's adopted building or fire code. Keep the residential product record separate from the gate operator and access-control schedules. CPSC rule explanation

How it is used in the field

Make the acceptance sheet a matrix of opening, protective-device identifier, covered zone, direction, and control mode. Attach the operator's prescribed checks and record the observed response against each applicable row. This exposes missing coverage during review and gives the service technician a location to retest after a sensor is struck or moved.

Carry the approved battery, charger, protective devices, and access-control interfaces into the same equipment schedule. Identify the intended response during normal power, backup operation, and restoration. Release automatic operation only after the required protection and fault responses meet the installed operator's instructions; a successful open-close cycle does not test the monitoring circuit.

CPSC recommends monthly checks of the reversing feature on residential garage-door openers, using the manufacturer's instructions. Put that interval in the residential owner's turnover information. Commercial gate service records should instead identify the relevant operator checks and actual zone layout, keeping the residential interval tied to the product CPSC addressed.

Frequently asked questions

Does the 2025 revision create an eighth edition?

No. The publisher identifies the active document as edition seven, originally published in May 2017, with a September 2025 revision. Include both edition and revision when identifying the reference used for a submittal.

Does UL 325 cover the fire-alarm function of a door?

Its public scope excludes active fire-alarm functionality and points to NFPA 80. Keep the required fire-door and alarm-interface records with their respective acceptance scope instead of closing them with the powered-operator record.