ASTM D226: felt type, code use and installed roll coverage
A felt specification should identify the material standard and type as well as the intended assembly. ASTM International’s D226/D226M-25 covers asphalt-saturated organic felt for steep-slope underlayment, built-up roof plies and asphalt waterproofing systems. Its Type I and Type II classifications correspond to the familiar No. 15 and No. 30 names. A delivery label establishes product identity; the roof or wall requirements establish its permitted use.
Applies to
Roofing estimators, siding contractors, submittal reviewers and inspectors use D226 to identify the specified felt. Record whether the material is serving as roof underlayment, a built-up roofing ply or part of a wall’s water-resistive barrier. Those uses lead to different assembly details even when the roll carries the same ASTM designation.
Key topics
Organic felt is a particular material family
ASTM D226/D226M-25 describes a single thickness of dry organic felt saturated with asphalt. Its scope associates built-up roofing plies with D312/D312M asphalt and waterproofing systems with D449/D449M asphalt. Identify the assembly materials together in the submittal. A description reading only “roofing felt” can lose the substrate, saturation and intended-use information needed to select the correct product. The underlayment guide compares the broader felt, synthetic and self-adhered choices.
Wall approval comes from the adopted wall provision
Minnesota Rule 1309.0703, subpart 2a, permits one layer of No. 15 asphalt felt complying with ASTM D226 Type I as an exterior-wall water-resistive barrier. Its wall detail calls for at least 2 in between horizontal courses and 6 in at joints. Minnesota’s adoption rule, 1309.0010, incorporates the 2018 IRC with state amendments. Enter that code basis with the wall detail, rather than recording the laps as D226 manufacturing requirements or applying them to a roof takeoff.
Roll contents and installed coverage are different quantities
TAMKO’s Heritage Series guide specification lists its No. 15 ASTM felt as a 36 in by 144 ft roll containing approximately 432 ft², with about 408 ft² of installed coverage under its instructions. Its No. 30 ASTM felt contains about 216 ft² and provides about 204 ft² of installed coverage. Use the coverage corresponding to the selected application when ordering. Gross roll area includes material consumed by laps and does not describe the completed roof area.
How it is used in the field
A 2,040 ft² roof area requires five rolls at 408 ft² of stated coverage per roll before separate allowances for cuts and waste. Using the 432 ft² gross contents would imply 2,160 ft² from the same five rolls, overstating nominal installed coverage by 120 ft². Keep roof area, product coverage and project waste as separate takeoff inputs so a later material reconciliation can explain the difference.
At delivery, capture the wrapper showing product name, ASTM designation and type. Match it to the approved assembly and supplier document. TAMKO’s specification separately lists products carrying ASTM D226 Type I and D4869 Type I classifications. The repeated Roman numeral does not make the underlying standards identical. Preserve the complete designation rather than shortening the receiving entry to “Type I felt.”
A shake-interlayment takeoff needs strip length in addition to roof area. Ripping TAMKO’s 36 in by 72 ft No. 30 ASTM roll into two 18 in strips produces 144 linear feet before end cuts and waste. Divide the specified total strip length by that output, then reconcile field-underlayment rolls separately. The wood-shake installation guide identifies where the interlayment is placed; the strip calculation prevents a roof-area coverage figure from hiding that separate material demand.
Roofers pursuing school and municipal reroofing packages use PorchRocket Bid Control for public roofing bids and the budget signals that precede them.
Frequently asked questions
Does a D226 label establish the permitted exposure time?
The material designation alone does not establish the product’s construction exposure allowance. Record that allowance from the selected product’s installation document and track the actual uncovered period in the roof record.
Can a wall felt detail be copied onto the roof?
Use the governing assembly detail. The Minnesota overlaps cited here govern the wall water-resistive barrier; roof application and shake interlayment have their own requirements.
Sources checked
- ASTM D226/D226M-25: organic felt types and intended assemblies
- Minnesota Rules 1309.0703, subpart 2a: ASTM D226 Type I wall barrier and overlaps
- TAMKO Heritage Series CSI guide specification, materials section: felt classifications and roll coverage
- Minnesota Rules 1309.0010: adoption of the 2018 IRC with state amendments