IEEE 1100: Emerald Book status and power-quality diagnosis

IEEE 1100-2005, the Emerald Book, is an inactive reference for investigating disturbances at electronic loads and designing their power and grounding arrangements. IEEE records its inactivation in 2021; the 2005 designation remains the latest published edition. For a reset or nuisance trip, its useful contribution is an investigation connecting the equipment symptom to recorded electrical events. IEEE 1159-2019 supplies the active monitoring vocabulary, while the project separately identifies its installation code and grounding design.

Current edition: IEEE 1100-2005 (2005 designation, published 2006; inactive-reserved)
Updated

Official publisher page

Applies to

Facility engineers, commissioning teams, electrical contractors, and equipment owners encounter this reference in specifications for computer rooms, industrial controls, and other sensitive loads. Its useful starting point is the relationship between an equipment symptom and the electrical conditions at that equipment.

Scope a power-quality investigation by equipment tag, symptom, operating state, and accessible recording locations. A commissioning acceptance sheet might document normal voltage on the day of testing yet contain no record of the brief disturbance that stops production on another shift. Agree on the event evidence needed to close the complaint before purchasing mitigation equipment.

Key topics

Is IEEE 1100 still an active standard?

IEEE's catalog records March 25, 2021 as the inactivation date for IEEE 1100-2005. It also records publication on May 24, 2006, which explains why the designation and publication year differ. Preserve the designation in a legacy specification, while describing its status accurately in new reports. Calling the document the current active grounding standard obscures that distinction.

Distinguish a supply sag from a grounding complaint

Fluke describes a sag as voltage remaining at approximately 10 to 90 percent of nominal for about half a cycle to less than one minute. State the remaining voltage explicitly: a drop to 80 percent leaves more voltage than an 80 percent reduction. Record duration, affected channels, nominal voltage, and the load's operating state so the event can be classified and compared with the equipment's ride-through data.

Correlate the failure before changing the grounding

Fluke recommends starting the monitoring at the affected load and comparing the malfunction time with the recorded voltage event, then moving upstream to locate the source. Capture the equipment clock offset as part of that comparison. A reset logged several minutes away from the electrical event does not establish a causal match simply because both appeared during the same shift.

Use IEEE 1159 for the measurement vocabulary

IEEE 1159-2019 is the active recommended practice for monitoring AC power quality, including monitoring devices, application techniques, and interpretation. IEEE's 3000-series directory places Green and Emerald Book subject matter in the 3003 grounding family. These references divide the work by subject; the directory does not identify a single new volume that reproduces every Emerald Book topic.

How it is used in the field

A 480 V channel falling to 384 V for 0.10 second on a 60 Hz supply records 80 percent remaining voltage for six cycles. The reduction is 96 V, or 20 percent. Those calculations place the event in Fluke's sag range. Compare its timestamp with the equipment log after accounting for clock offset; the percentage alone does not establish which disturbance caused a reset.

Use matching reference channels when comparing a service recorder with one at a PDU: phase-to-phase traces belong against phase-to-phase traces, with transformer ratio and connection identified. A 480 V input and 208 V output need comparison as percentages of their respective nominal voltages. Mark recorder locations and channel assignments on the PDU and RPP commissioning drawing.

Close the investigation with the event record, the malfunction timestamp, the affected circuit, the corrective work, and repeat monitoring under the relevant operating condition. Where an isolated-ground receptacle was proposed, attach the measurements that justify that choice. A receptacle replacement and a voltage-sag correction address different causes even when both were requested as a cure for resets.

Edition history

The 2005 edition superseded IEEE 1100-1999. IEEE separately lists an ANSI withdrawal date of August 19, 2016 and its own 2021 inactivation date. Those are different catalog events, neither a new edition nor a replacement document.

Adoption

An Emerald Book requirement reaches a job through the specification or other governing project documents. Identify the requested performance result and its verification method in the submittal. The book's inactive status and a contract's reference to it are separate facts.

Estimators defining a power-quality survey use PorchRocket Bid Control to identify winners of past public electrical bids and track the next agency solicitation.

Frequently asked questions

Does an Emerald Book citation prove that an isolated ground will stop resets?

It identifies a reference, not the cause of the reset. Establish whether voltage disturbances, wiring conditions, or another measured condition coincide with the failure before assigning the corrective work.

Should a report cite 2005 or 2006 for IEEE 1100?

Use IEEE 1100-2005 as the document designation. The publisher records 2006 as its publication year; changing the designation to IEEE 1100-2006 would identify an edition the catalog does not list.

Does an 80 percent sag mean 80 percent of the voltage was lost?

Specify remaining voltage to remove the ambiguity. A 480 V channel at 384 V retains 80 percent of nominal and has lost 20 percent. Put both the volts and percentage remaining in the event report.