ANVILFIELD Try FieldOS

ASTM International

ASTM E1745: vapor-retarder classes and conditioned permeance

An under-slab sheet qualifies to ASTM E1745-17(2023) through strength, puncture and vapor-transmission evidence, including conditioned specimens. The useful purchase question is whether the delivered product meets the specified class and any tighter permeance requirement after exposure. Stego's January 2025 data sheet, for example, reports 0.0086 perm initially and 0.0098 perm after wetting, drying and soaking for its 15-mil Wrap. An initial value alone omits that durability comparison.

Current edition: ASTM E1745-17(2023) (2023 reapproval)
Updated

Official publisher page

Applies to

Material reviewers need the identified plastic sheet and its complete test package; concrete crews need the accepted sheet and compatible detailing materials before placement. Coordinate the under-slab membrane work with foundation waterproofing. A sheet selected for vapor control and a system designed for groundwater pressure have different acceptance questions, even where their details meet at the slab edge.

Key topics

Does Class A establish the thickness and permeance to order?

Stego's January 2025 Wrap sheet reports 70.6 lbf/in tensile strength and 2,266 grams falling-dart resistance, compared with the 45 lbf/in and 2,200-gram Class A minima in its E1745 explanation. Those results establish strength margins, not a thickness or project permeance limit. A 15-mil, 0.01-perm purchase specification is ten times tighter in permeance than the 0.1-perm E1745 ceiling identified by Stego, and still needs separate evidence of sheet thickness. Review those order requirements alongside the conditioned results.

Ask for conditioned results as well as new-material tests

ASTM E1745-17(2023) requires testing on new material and on material conditioned or exposed to represent potential service conditions. A new-sheet permeance number therefore does not document the whole qualification. ASTM E154/E154M-08a(2025) describes test methods including vapor transmission after wetting and drying and after extended soaking. Retain the exposure identification with the resulting measurement, rather than putting every reported permeance into one unlabeled column.

Match unusual soil and exposure conditions to the test program

The E1745 public abstract identifies additional requirements under special conditions, including flame spread, permeance after exposure to petroleum carriers for soil treatments, and ultraviolet exposure. E154/E154M-08a(2025) also describes soil-organism, temperature and plastic-flow testing and calls for the purchaser and supplier to agree on the tests and required results relevant to the exposure. Record planned soil treatment and pre-cover exposure before approving the submitted test package.

Bituminous sheets have a different material specification

ASTM E1745 expressly excludes bituminous vapor retarders and directs that material family to E1993/E1993M. A sheet's black appearance, nominal thickness or use beneath concrete does not identify which material specification it meets. Ask the supplier to identify its construction and qualification document. This distinction matters when a proposed replacement changes from plastic film to a bituminous membrane while the submittal cover sheet still says E1745.

Keep material qualification distinct from the pre-pour inspection

ASTM E1643-24 addresses selection, design, installation and inspection of under-slab sheet vapor retarders. Its scope excludes frost-heave and hydrostatic-pressure conditions and does not assign the sheet a waterproofing function. Pair the E1745 qualification with the specified installation record; use the separate waterproofing design where groundwater pressure controls. A report proving film properties cannot establish continuity of the sheet installed around columns and services.

How it is used in the field

Compare the complete conditioned series for a proposed sheet. Stego's January 28, 2025 Wrap data sheet reports 0.0098 perm after wetting, drying and soaking, 0.0091 after heat conditioning, 0.0097 after low-temperature conditioning and 0.0095 after soil-organism exposure. The highest of those results is 0.0098, which remains below a specified 0.01-perm ceiling. Record each exposure rather than replacing the series with the initial 0.0086 result.

Build the concrete placement date into material approval. Stego's January 2025 sheet limits the interval after installation to 7 days before concrete placement or full protection from UV and weather. That is a product handling limit, distinct from passing E1745 exposure tests. For treated soil, also identify the treatment chemistry and obtain the applicable petroleum-carrier exposure evidence described by E1745 and E154.

Create two release records: the material acceptance and the installed-sheet acceptance before concrete covers it. The first contains the qualification and delivered product identity; the second locates repairs, interfaces and the inspected condition. Connect them by product and area so a later flooring investigation can trace the accepted sheet to the slab in question.

Flooring release remains a later decision. A compliant membrane reduces the ground-moisture pathway but does not measure the water remaining in the concrete. The slab moisture-testing guide covers the measurements used for that decision, and the terrazzo guide addresses the receiving substrate. Preserve those later results alongside the membrane history.

Edition history

ASTM lists E1745-17(2023) as active, with the 2017 revision reapproved in 2023. The current related test-method publication is E154/E154M-08a(2025), and the installation practice is E1643-24. These documents have different jobs and publication dates; a single entry labeled vapor-barrier ASTM test loses that distinction.

Frequently asked questions

Does an initial permeance result prove long-term qualification?

E1745 includes conditioned or exposed specimens as well as new material. The qualification package needs the applicable post-exposure evidence, identified by test and conditioning, alongside the initial result.

Is every E154 exposure test required on every project?

Keep the mandatory E1745 qualification separate from additional exposure tests. E154 provides methods for multiple exposures, and its purchaser-supplier agreement identifies the additional evaluations relevant to the intended service. That agreement does not remove the conditioned tests required to support an E1745 class claim.

Can E1745 approval substitute for hydrostatic waterproofing?

E1745 qualifies the plastic vapor-retarder material. The companion E1643 practice expressly excludes hydrostatic-pressure conditions; a pressure-water condition requires its defined waterproofing system and interfaces.

Sources checked

Field guides that apply ASTM E1745

Browse all codes and standards